BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2019 at 8:00 PM

Updated November 26, 2025

Site work and new construction of a transportation facility in Austin, Texas. Completed plans call for the construction of a transportation facility.

The existing Downtown Station was constructed as a "temporary" station in 2010, with a non-permanent plat-form and non-permanent amenities. Capital Metro has completed the designs of a new, permanent Downtown Sta-tion (aka "Project Connect- Downtown Multimodal Station") which will replace the existing station. The design of the Downtown Station will address many surrounding urban context issues in an appropriate manner, and has been coordinated with other adjacent public and private projects.

Award

Transportation Terminals

$36,800,000.00

Public - State/Provincial

New Construction, Site Work

1

7

616

10

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
315
Active Projects
150
Bidding Soon
2,871
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2018

January 14, 2019

Project location map

To Be Determined, Austin, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.