Site work and paving for a road / highway in Winder, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of October 28, 2020 this project has been awarded to Peach State Construction Co., LLC in the amount of $1,152,916.10. The project consists of the construction of a 5,274 lineal feet (1 mile), 10 feet wide, 5 inch thick concrete (3,000 psi) multi-use trail on DNR and the City of Winder properties in Winder, Georgia.The project will require the contractor to construct curb & gutter, sidewalk, concrete trail, retaining walls, drainage structures, box culvert, replace a water line, install a pre-engineered bridge,landscaping, and trail amenities.The project begins at the entrance to the pavilion and ends at the new trailhead at 41 Lee Street near the intersection of South Jackson Street, Winder, Georgia 30680. The project is available for inspection by potential bidders at any time. Bids will be accepted for the following items: Testing & Inspections, Erosion Control, Site Demo, Grading, Storm Drainage, Box Culvert, Water, Sidewalk, Curb & Gutter, Asphalt Paving, Pavement Marking, Landscaping, Wood Fence, Pedestrian Bridge, Helical Piers, Trail Signage, Waste Receptacle, Dog Station, Benches, Bike Racks, Bollards Construction services are the only services being sought after for this project. All contractors submitting Bid's for this project shall be prepared to conduct all the required construction activities outlined in the construction documents. The City will not accept any Bid from firms interested in performing a single function of the work. Contractors submitting Bids for this project, and their sub-contractors, will be required to comply with all Federal, State, territorial, and local laws. A Bid Bond in the amount of 5 percent must be submitted with the Bid. Performance Bonds and Payment Bonds will be required. Deadline for clarifications and questions Tuesday, September 22, 2020 at 12:00pm. All questions regarding this project should be directed in writing to Mayor David Maynard at david.maynard@cityofwinder.com. The City of Winder reserves the right to modify this RFP at any time.Final Clarifications and Questions will be posted on the City of Winder's Website no later than September 29, 2020 at 12:00pm. The City of Winder also reserves the right to reject any and all Bid's if it is in their best interest to do so. The Contract for Construction with be signed by the City. Construction must begin within ten (10) calendar days from the date shown on the signed contract. The project must be completed with 180 calendar days. The Box Culvert under Yargo Camp Road must begin (January 4, 2021 and be completed by February 26, 2021 GROSS LENGTH OF PROJECT: 5,274 LF MAINLINE TRAIL: 4,760 LF SPURTRAIL: 487 LF

Award

Roads / Highways

$1,152,916.00

Public - City

Paving, Site Work

46

1

58

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
152
Bidding Soon
2,186
All Active Projects
1,011
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 13, 2020

January 4, 2021

February 26, 2021

img_map_placeholder

Lee Street and jackson Street, Winder, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.