BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2019 at 7:00 PM

Updated May 30, 2025

Site work and paving for a civil project in Blue River, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

This Project Will Be Advertised on a Service Disabled Veteran Owned Small Business Basis. The project may consist of the following: The project is located in Summit County, Colorado, near the Copper Mountain Ski Resort. The project is roughly parallel to State Highway 91 between the Copper Mountain Far East Parking Lot (approx. Milepost 21.7) and the Climax Mine Water Treatment Plant access road (approx. Milepost 18.6). The general scope of improvements is construction of approximately 3.3 miles of a new multi-use trail described as follows: Approx. 3.2 miles of 12' wide asphalt concrete pavement trail Approx. 460 feet of 12' wide timber boardwalk; Approx. 260 feet, 12' wide two-span prefabricated steel pedestrian bridge with simulated stone reinforced concrete abutments and pier. Proposed new construction work includes linear grading, aggregate base, asphalt concrete pavement, drainage culvert installation, boardwalk, bridgework, pavement markings and signs. The project is located on United State Forest Service lands within a Special Use Permit to Summit County Open Space and Trails and a portion within a CDOT Highway Easement Deed. The proposed trail alignment lies on top an existing utility corridor that contains natural gas, fiber optic, and electrical facilities that serve regional, statewide, and interstate customers. There are numerous wetlands adjacent to the proposed path, and the boardwalk will traverse a critical wetland restoration site. Environmental restrictions will be in effect. The contractor will need to exercise caution to ensure no unplanned disturbance to these critical facilities and resources. Access to and within the site is very limited, which will constrain the size and type of equipment capable of performing the work. Schedule A: Line Item Unit Estimated Quantity 20420-0000 Embankment Construction 17,300 CUYD 30202-2000 Method 2 8,300 TON 40301-0100 Asphalt Concrete Pavement 3,850 TON 55701-2000 Structural Timber and Lumber, Treated 18 MFBM 58202-0000 Helical Pile, In Place 94 EACH 58405-1000 Fiberglass Reinforced Plastic, Grating 5,520 SQFT 62406-0400 Placing Conserved Topsoil, 6-Inch Depth 2.0 ACRES Option X: Line Item Unit Estimated Quantity 20420-0000 Embankment Construction 900 CUYD 30202-2000 Roadway Aggregate, Method 2 400 TON 40301-0100 Asphalt Concrete Pavement 200 TON 55201-0200 Structural Concrete, Class A (AE) 129 CUYD 55401-1000 Reinforcing Steel 7,000 LB 55401-2000 Reinforcing Steel, Epoxy Coated 4,200 LB 55504-0000 Pre-fabricated Steel Bridge ALL LPSM 62406-0400 Placing Conserved Topsoil, 6-Inch Depth 0.1 ACRES Estimated total cost is $3 to $5 million. A Notice to Proceed must be issued before commencement of any work. The contract completion date is October 22, 2020. No additional days will be awarded if Option X is awarded.

Award

Roads / Highways

$5,554,236.00

Public - Federal

Paving, Site Work

495

1

4

15

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
140
Bidding Soon
1,294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2019

May 15, 2020

Project location map

To Be Determined, Blue River, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.