Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 23, 2024 at 7:00 PM
Updated January 29, 2024
Site work for a municipal facility in Wellford, South Carolina. Conceptual plans call for site work for a municipal facility.
Project Description and Justification The Wellford Landfill is currently permitted to accept and grind yard debris into mulch. The permitted wood chipping/mulch area is currently located within the future Phase VII, Class three landfill expansion. In order to proceed with the Phase VII construction, the wood chipping/mulch area will need to be re-permitted and re-located to another area within the Wellford Landfill facility. The Solid Waste department is currently grading an area adjacent to our existing maintenance building and recycling pad in anticipation of the relocation. This project will consist of permitting and constructing a concrete pad (approximately 175' x 325') and associated gravel entrance/exit roads and storm water controls (catch basins and drainage pipes). This project supports Council's strategic vision to develop an effective and efficient infrastructure plan as it is a core component of the site plan for the Wellford Landfill and supports the build-out of the Phase VII MSW landfill. This project has the potential to diversify the revenue stream for the Wellford Landfill by providing a facility capable of hosting a composting program for which tipping fees may be charged, should the County choose to pursue this to reduce the overall cost of operating a solid waste system. As of January 23, 2024, this project is going through the permitting and design process. This project is currently in the FY 2014-2028 Capital Improvement Plan. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$10,700,000.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 28, 2024
To Be Determined, Wellford, SC
Related To This Project
Wellford, SC
Bid Date: Feb 02 2022
Wellford, SC
Bid Date: Mar 07 2024
Wellford, SC
Bid Date: Oct 02 2020
Wellford, SC
Bid Date: May 02 2019
Wellford, SC
Bid Date: Jan 09 2025
Wellford, SC
Bid Date: Mar 13 2025
Wellford, SC
Bid Date: Jul 17 2025
Wellford, SC
Bid Date: Oct 23 2025
Wellford, SC
Bid Date: Dec 07 2023
Wellford, SC
Bid Date: Feb 24 2022
Wellford, SC
Bid Date: Aug 24 2021
Wellford, SC
Bid Date: Sep 03 2024
Wellford, SC
Bid Date: Oct 04 2022
Wellford, SC
Bid Date: Jun 30 2022
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
