BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2025 at 8:00 PM

Updated April 22, 2025

Demolition, site work, paving and new construction of a water / sewer project in Wellford, South Carolina. Working plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; for site work for a water / sewer project; and for paving for a water / sewer project.

As of April 21 2025, the construction manager is working through pre-construction. The project is anticipated to start construction, between August and September 2025. Completion is expected June 2026. The previous solicitation is listed below for reference. The Construction Manager-at-Risk has released the project for sub bidding. We are requesting quotes for the SJWD Hwy 29 Booster Pump Station CMAR 60% Design project. The project includes demolition of the existing pump station, construction of a new booster pump station, masonry building, piping, horizontal directional drilling, HVAC, plumbing, electrical, sitework, paving, fencing, etc. The booster pump station will have 2ea horizontal split case pumps and associated instrumentation and controls. Interested parties must prequalify with the Construction Manager-at-Risk, prior to submitting bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Pre-Construction/Negotiated

Water / Sewer

$6,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

73

24

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
107
Bidding Soon
1,487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

August 14, 2025

Project location map

10064 Warren H Abernathy Hwy, Wellford, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.