Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 19, 2025 at 8:00 PM
Updated May 20, 2025
Renovation of a mixed-use development in Berkeley, California. Working plans call for the renovation of a 45,000-square-foot, three-story above grade library; and educational facility.
Turner has been awarded the UCB Moffitt Library project designed by BNIM Architects and MEP by Introba, located at the UC Berkeley Campus along University Drive, with Memorial Glade and Doe Library to the east, California Hall to the south, and Valley Life Sciences Building to the west. This is a renovation of 3 full floors and upgrades to an additional 2 floors totaling 102,000 square feet within the existing Moffitt Library. These renovations will bring upgrades to the currently underutilized floors of the library, expanding the student's study and collaboration spaces. This project is seeking LEED certification and is subject to Buy Clean California regulation. For information on how to Pre-Qualify with Turner, please contact Crystal Chang – Subject: UCB Moffitt at the following email address: cchang@tcco.com Construction is expected to begin in May of 2025 and completion is expected in the fourth quarter of 2026. Bidding on this project has been completed and all sub-bids have been awarded.
Pre-Construction/Negotiated
Educational
$35,000,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 23, 2025
350 Moffitt Library, Berkeley, CA
Related To This Project
Berkeley, CA
Bid Date: Oct 03 2024
Berkeley, CA
--
Berkeley, CA
Bid Date: Oct 29 2024
Berkeley, CA
--
Berkeley, CA
Bid Date: Oct 24 2024
Berkeley, CA
--
Berkeley, CA
--
Berkeley, CA
Bid Date: Nov 19 2024
Berkeley, CA
Bid Date: Nov 06 2024
Berkeley, CA
Bid Date: Oct 08 2024
Berkeley, CA
Bid Date: Oct 17 2024
Berkeley, CA
Bid Date: Oct 22 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
