BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2019 at 7:00 PM

Updated April 1, 2025

Site work for a water / sewer project in Portland, Oregon. Completed plans call for site work for a water / sewer project.

The City encourages bidding by D/M/W/ESB's and will assist such firms to understand and participate in the formal bidding processes. Bidder must be certified as an EEO Affirmative Action Employer as prescribed by Chapter 5.33.076 of the Code of the City of Portland. On all construction projects the successful bidder shall be required to certify that he/she is in compliance with ORS 279C.800 to 279C.870 or the Davis Bacon Act, 40 USC 3141 to 3148 relative to prevailing wage rates. On projects where bidders are required to be prequalified, the bidder must be prequalified by Procurement Services in the stated category for an amount equal to the amount shown in the project description in this advertisement. Additional prequalification requirements may be described in the project specifications. A prequalification application must be filed with Procurement Services at least ten (10) calendar days prior to the last day for receipt of bids, unless stated otherwise in the bid documents. For bidding information contact Emmanuel Amunga at emmanuel.amunga@portlandoregon.gov . Prequalification Required in Class 04 - Reinforced Concrete FOR $700,000. Prequalification Application due at least 10 days prior to bid due date. CONTRACT TIME A. All Work to be performed under this Contract shall be Substantially Completed within 300 days from the contract execution date. Within 15 days after contract execution, Contractor will notify Owner in writing of its intended start date. A Notice to Proceed will be issued for the intended start date and before any work begins. All work shall be Substantially Completed within 120 days from the Notice to Proceed date. The Program has an aspirational goal of twenty percent (20%) of Hard Construction Costs for D /M /W / ESB subcontractor utilization on projects subject to the Program within the Aspirational Goal, a further goal of 14% D/M/WBE utilization is desired. The City encourages Contractors to diversify their D/ M/ W / ESB subcontractor utilization from all available divisions of work

Award

Water / Sewer

$820,108.00

Public - City

Site Work

11

1

2

9

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
83
Bidding Soon
1,063
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.