BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Cuba, New Mexico. Conceptual plans call for the construction of a water / sewer project.

Plan, design and construct new collection and wastewater treatment system to serve existing governmental buildings at the Torreon Navajo Chapter. The new system will replace separate on-site septic tank / drainfield systems and will serve the Senior Center, Chapter House, Head Start Building, Clinic, and Administrative Building. The existing buildings are currently served by aging septic tank / drainfield systems, some of which have failed and are not providing adequate capacity for current and planned improvements to buildings. Among the new improvements which will require increased wastewater capacity is a new Administrative Complex, which is in the planning stages. The Chapter will procure an Engineer to help plan and design the system. Phase I consists of a conceptual design, land acquisition, cultural resource inventory, archeological and environmental assessment. The full design of the system will be completed during Phase II. Phase III will consist of the construction of the project and will take 12 months. The Navajo Tribal Utility Authority will own and operate the system. Project is included in the New Mexico Department of Finance and Administration's FY 2023-2027 CIP. As of January 28, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated in 2025.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,200,000.00

Public - Federal

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
174
All Active Projects
77
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

To Be Determined, Cuba, NM

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.