BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Hemingway, South Carolina. Completed plans call for site work for a water / sewer project.

***As of January 9,2019 project has not been awarded yet. A timeline for award has not yet been established. The Project consists of three divisions as listed below. Division 1: The installation of a new 400 GPM groundwater supply well, chemical feed plumbing, site piping and appurtenances at the ECA Tank and Well Site. Division 2: The installation of a THM removal system comprised of a tank mixer, sprayer and blower installed within the ECA elevated storage tank. Division 3: The installation of 8 automatic flushing devices, piping and appurtenances throughout the water distribution system. Bids will be received for a single prime Contract. The project is being funded (in part) by a loan from the State Revolving Fund and therefore bidders must comply with all applicable State and Federal requirements identified in the contract documents. Products used for construction must meet American Iron & Steel requirement. Another requirement of the project is that prospective bidders must implement procedures that ensure disadvantaged business enterprise (DBE) firms are given opportunities for meaningful participation if subcontracts are awarded. The contractor must follow the good faith strategies outlines in the Disadvantaged Business Enterprise (DBE) compliance section of the Federal Requirements for SRF Funding. The goal stated in the contract documents for participation by MBE/WBE firms is MBE: 3.6% and WBE: 2.4%. No bid will be considered unless the bidder is legally qualified under the provisions of the South Carolina Contractor''s Licensing Law (South Carolina Code of Laws as amended on April 1, 1999, Chapter 11, Sections 40-11-10 through 40 11 428). Contractors shall have a classification of WL, WP. No bidder may withdraw the bid within 90 days after the actual date of the opening and thereof. All communication about the receipt of plans, bid results and contract award should be directed to Hanna Engineering. The Owner reserves the right to waive any informalities or to reject any or all bids.

Post-Bid

Water / Sewer

$50,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
48
Bidding Soon
528
All Active Projects
253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2019

January 29, 2020

img_map_placeholder

To Be Determined, Hemingway, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.