BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Stillman Valley, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The proposed Water Main and Street Improvements for which the Village is soliciting bids consists of one contract, "Water Main and Street Improvements, Grant Street-Stillman Valley Road to East of Walnut Street, 2018". The Project Manual, Construction Drawings and Bid Documents PDFs can be downloaded by depositing ten dollars ($10,00) by credit card. Contractors can also obtain the Contract Documents in PDF format on a CD by depositing $50.00 with Willett, Hofmann & Associates, Inc., 809 East Second Street, Dixon, Illinois for each CD obtained. Said deposit is NON-REFUNDABLE. A certified check or bank draft on a responsible solvent bank, or a satisfactory bid bond executed by the bidder on an acceptable surety company, payable to the Village of Stillman Valley, Illinois, in an amount not less than five percent (5%) of the total bid shall be submitted with each bid. The successful bidder will be required to furnish satisfactory performance and payment bonds each for 100% of the awarded contract price. No bid shall be withdrawn after the opening of bids without the consent of the Village of Stillman Valley for a period of ninety (90) days after the scheduled time of receiving bids. Any contract or contracts awarded under this invitation forbids are expected to be funded in partby a loan from the Illinois Environmental Protection Agency (Illinois EPA), Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation to bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a'-5), as defined by the United States Department of Labor, the Employment ofIllinois Workers onPublic Works Act (30 ILCS 570) and the "Use of American Iron and Steel" requirements as contained in Section 436 of H.R. 3547, The Consolidated Appropriation Act, 2014. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60*4. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the construction documents must be paid on this project and that the contractor must insure that employees and applicants for employment are not discriminated against because of race, color, religion, sex or national origin. The Village of Stillman Valley is an equal opportunity employer. The Village does not discriminate on the basis of handicapped status in the admission or access to, or treatment or employment in, its programs or activities. The Village of Stillman Valley, Illinois reserves the right to reject any non-responsive bid and/or non responsible bid. Bids may be held by the Village of Stillman Valley, Illinois for a period not to exceed ninety (90) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the Contract. Work shall commence under this contract on May 24, 2019 or the day after the last day of school for the Meridian School District and will be substantially completed on August 9, 2019, and final completion shall be on September 23, 2019.

Award

Roads / Highways

$606,133.00

Public - City

Paving, Site Work

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
103
Bidding Soon
1,783
All Active Projects
763
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2019

May 24, 2019

img_map_placeholder

W Grant St, Stillman Valley, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.