Site work and paving for a road / highway in Soap Lake, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of February 05, 2019, this project has not yet been awarded. A timeline for award has not yet been established. For furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to construct 2019 Street Improvements. This Contract provides for two (2) schedules of work, all in accordance with the attached Contract Plans, these Special Provisions, and the Standard Specifications: Schedule A: Division Street Improvements: This Contract provides for the overlay of approximately 2,100 lineal feet of Division Street, front SR 28 to 7th Avenue SE, including but not limited to pulverizing the existing pavement, excavation, grading, subgrade preparation, storm drainage improvements, cement concrete curb, gutters, curb ramps, sidewalks, driveway entrances, cement treated base, hot mix asphalt pavement, pavement marking, illumination system; miscellaneous surface restoration, traffic control and all other appurtenances required to complete the work, Schedule B: FY 2019 Rehabilitation Project: The construction of the overlay of approximately 850 lineal feet of 3rd Avenue SE, from SR 17 to Fern Street, approximately 350 lineal feet of Elder Street, from 3rd Avenue to 4th Avenue, and approximately 500 lineal feet of 4th Avenue SE, front SR 17 to Elder Street, including but not limited to pulverizing the existing pavement, excavation, grad ing, subgrade preparation, cement treated base, cement concrete curb, hot mix asphalt pavement, pavement marking, miscellaneous surface restoration, traffic control and all other appurtenances required to complete the work..Contractors are required to bid Schedules. Failure to bidall Schedules shall make the bid unresponsive. Estimated Project Value $880,000 to $1,000,000 The basis of award shall be the lowest, responsive, responsible bidder for: the combined total of Schedule A, Schedule B, and Additive item No. 1; or the combined total of Schedule A, Schedule B, and. Additive Item No. 2, as available funding allows and as it best serves the interests of the Contracting Agency. The Work shall be Substantially complete within 65 working days after the commencement date stated. in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract. Provisions and Contract. Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Soap Lake, Washington. The Proposals will be publicly opened and read aloud shortly after the time and date stated above. Proposals are to be submitted only on the form provided with the Bid Documents, .All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the City of Soap Lake and in an amount of not less than five percent; (5%) of the total Proposal amount. Financing of the Project. has been provided by the City of Soap Lake, Washington and the Washington State Transportation improvement Board. The City of Soap Lake expressly reserves the right, to reject any or all Proposals and to waive minor irregularities or informalities and to Award the Project to the lowest, responsive,responsible bidder as it best serves the interests of the City.
Award
Roads / Highways
$1,047,154.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2019
March 18, 2019
Soap Lake Way NW, Soap Lake, WA
Related To This Project
Soap Lake, WA
Bid Date: Jan 31 2024
Soap Lake, WA
Bid Date: May 09 2024
Soap Lake, WA
Bid Date: May 09 2024
Soap Lake, WA
Bid Date: Feb 13 2020
Soap Lake, WA
--
Soap Lake, WA
Bid Date: Nov 18 2021
Soap Lake, WA
Bid Date: Jul 15 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.