Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 21, 2019 at 8:00 PM
Updated September 15, 2023
Site work for a water / sewer project in Jacksonville, Florida. Working plans call for site work for a water / sewer project.
EA is requesting proposals from qualified Design-Build (DB) firms to provide design and construction services for the Walnut Street Emergency Bypass Force Main project. The scope of work includes the installation of approximately 600 linear feet (LF) of sewer force main constructed by horizontal directional drill (HDD) method from the north side of Martin Luther King Jr Parkway to the south side of MLK Parkway. The work also includes installation of new JEA Type G manhole on the north side of MLK Parkway and connecting the new bypass Force Main to an existing manhole on the south side of MLK. The force main on the north side will not terminate in the new structure. Shortlist Confirmed.
Final Planning
Water / Sewer
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
