BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2020 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Clarendon Hills, Illinois. Completed plans call for site work for a water / sewer project.

Work consists of proposed 6", 8", & 10" Water Main, Storm and Sanitary Sewer spot repairs (crossings), Class D Patching, and landscape restoration. The proposed work is officially known as "2019 WATER MAIN REPLACEMENT" and further described as the construction of approximately 7,520 lineal feet of new 10” ductile iron water main, valve vaults, fire hydrants, and new water service connections (open cut and pushed) in Clarendon Hills, Illinois, as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL).

Award

Water / Sewer

$429,955.00

Public - City

Site Work

32

5

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
241
Bidding Soon
3,260
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2019

March 16, 2019

Project location map

Multiple Locations, Clarendon Hills, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.