BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2019 at 8:00 PM

Updated September 6, 2025

Renovation of a mixed-use development in Edmonton, Alberta. Completed plans call for the renovation of a educational facility.

The project includes the following two (2) phases: .1 Phase One: Mechanical Renewal .2 Phase Two: Wet Lab Development Phase One is to replace and/or renew the associated base building mechanical ventilation systems servicing the second and third floors for the Brain and Aging Research Building (BARB). The proposed program shall include for the complete replacement of the existing base building ventilation system servicing these floors, reconnection of the existing second floor air distribution system to the new base building service and replacement of the existing third floor air-distribution system including the supply and installation of a new Air Handling Unit (AHU) by the successful Construction Manager. The successful Construction Manager will need to consider various construction strategies to help mitigate or minimize end user impacts in collaboration with the University and Consultant. The existing basement and main floor levels shall remain continuously occupied and fully serviced throughout and after the renovations. As well, due to the research being conducted on the second floor it shall also remain continuously occupied and fully serviced during the renovations. The Construction Cost Limitation for this Work is $1.7 million GST Extra, including the purchasing of the mechanical equipment. For Phase Two, the University is exploring opportunities for additional funding and the project could expand further to include wet lab development and/or full wet lab fitout on the third floor of the building. Funding is in place for Pre-Construction Services but not Construction/Post Construction Services. If approved in full, the project will significantly expand and enhance research and innovation capacity through the development of additional wet lab space on campus. The Construction Cost Limitation for this Work is $4.7 million GST Extra.

Award

Educational

$6,946,880.00

Public - State/Provincial

Renovation

22

7

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
19
Bidding Soon
568
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2019

September 4, 2019

Project location map

85 Ave NW, Edmonton, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.