EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2019 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Mercer, Pennsylvania. Completed plans call for site work for a water / sewer project.

This project involves the installation of approximately 1,300 L.F. of 10 HDPE fused sanitary sewer force main; directional boring; installation of a precast manhole; all associated restoration, traffic control, utility coordination and resident notifications, complete in place. Performance and Labor and Material Payment Bonds, along with Public Liability and Property Damage Certificates of Insurance in thee amounts specified, as well as Certificates of Workman's Compensation must be filed with the executed Agreement. No Bidder may withdraw his proposal during the sixty (60) day period without forfeiting his Proposal Guarantee. Pennsylvania Prevailing Wages shall be paid on this contract. Proposals to receive consideration must be accompanied by a Certified Check or Bidders Bond from a Surety Company authorized to do business in Pennsylvania, made to the order of Springfield Township in the amount equal to ten percent (10%) of the total amount of the Proposal as a guarantee that, if the Proposal is accepted, the successful Bidder will enter into an Agreement within 15 days after Notice of the Award of the Contract. The Owner reserves the right to reject any or all Bids, or any part thereof, for any reason, and also reserves the right to waive any informality therein. Bidders are advised that the Township will award the contract to the lowest responsible bidder based on the total bid submitted. However, the bidder is advised that the Township expressly reserves the right to reject all bids, and specifically reserves the right to award to the lowest responsible bidder a contract for all or any portions of the work listed in the proposal, and in awarding a contract for less than the total work listed, or less than all portions of the work listed, the contract price will be determined from the total quantities for each item listed and the unit price bid for each item listed. The Proposals must be made to Springfield Township, Mercer County, Pennsylvania, and shall remain firm for a period of sixty (60) days.

Award

Water / Sewer

$133,875.00

Public - County

Site Work

7

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Unit Prices, Alternates, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Exploratory Excavations, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping, Gas and Vapor Process Piping, Liquids Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
97
Bidding Soon
1,271
All Active Projects
535
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2019

March 28, 2019

img_map_placeholder

PA-208, Mercer, PA

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

SR 208 Additional Force Main

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.