BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2019 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Framingham, Massachusetts. Completed plans call for site work for a educational facility; for paving for a educational facility; playground / park / athletic field; playground / park / athletic field; and water / sewer project.

**The substantial start date is May 6, 2019, and the completion date is on August 2, 2019.** Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. This project includes replacement of the existing synthetic turf field with a new synthetic turf system including 5 sports permanently stitched into the turf, partial reclaim and reuse of existing fill, new drainage and drainage improvements. Disposal of existing track surface with improvements. Design will be suitable for NCAA Division III outdoor athletic field. Alternates as noted in contract documents. Work to be completed Summer 2019. Future scope to be determined. Last day for Bidder Questions Will be Extended to February 20, 2019 5:00pm

Award

Playgrounds / Parks / Athletic Fields

$1,002,100.00

Public - State/Provincial

Paving, Site Work

22

18

19

6

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
609
Active Projects
225
Bidding Soon
4,687
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2019

May 6, 2019

Project location map

200 Maple St, Framingham, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.