BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Carroll, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The 2019 Carroll Streets Resurfacing project includes segments along Crawford Street, First Street, Bluff Street, East Street, West Street, and the Water Pumping Station parking lot. Specific improvement items include full-depth patching, curb replacement, driveway replacement, pedestrian curb ramps, minor storm sewer improvements, pavement milling / scarification, hot mix asphalt (HMA) resurfacing, and seeding, mulching and fertilizing. Consideration by City council at its meeting on march 26,2019 at 5.15 pm. The city of carroll, Iowa reserves right to defer acceptance of any bid for a period of sixty (60) calendar days after receipt of bid and no bid may be withdrawn during this period. Each bidder shall accompany its bid security for performance bond of the contract, in an amount equal to 100% of the amount of contract. The city of carroll, Iowa hereby reserves the right to reject any or all bids, to waive in-formalities and to enter into such contract, or contracts,as it shall deem to be in the best interest of the jurisdiction. The contractor shall fully complete seeding no later than September 30, 2019; and shall substantially complete the project no later than September 30, 2019. Should the contractor fail to complete the work in this time frame, liquidated damages of $1,000.00 per calendar day will be assessed for work not completed within the designated contract term. Each successful bidder will be required to furnish à corporate surety bond in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by the City of Carroll, Iowa and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Carroll, Iowa from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of four (4) years from and after acceptance of the contract. The 2019 Carroll Streets Resurfacing project includes segments along Crawford Street, First Street, Bluff Street, East Street, West Street, and the Water Pumping Station parking lot. Specific improvement items include full-depth patching, curb replacement, driveway replacement, pedestrian curb ramps, minor storm sewer improvements, pavement milling/scarification, hot mix asphalt (HMA) resurfacing, and seeding, mulching and fertilizing. This project will follow the current SUDAS Standard Specifications as well as the Carroll Supplemental Specifications.

Award

Roads / Highways

$928,995.00

Public - City

Paving, Site Work

89

1

5

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
63
Bidding Soon
1,161
All Active Projects
449
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 14, 2019

May 13, 2019

September 30, 2019

img_map_placeholder

Multiple Locations, Carroll, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.