Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Excelsior, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Introduce multi-use trail along Mill Street (CSAH 82) from the South County Line to 2nd Street in the Cities of Shorewood and Excelsior. Mill Street (CSAH 82) currently serves north/south trips between Carver County and Hennepin County as direct access is available to both TH 5 and TH 7. The roadway includes one vehicle lane in each direction with paved shoulders that provide space for on-road biking. This current configuration was introduced as part of a paving project completed in 2018 that included solid white pavement markings to better define the shoulder area. However, this current environment is relatively uncomfortable for multi-modal users, especially pedestrians, as people walking are required to travel adjacent to vehicle lanes since no sidewalks exist. Furthermore, this Mill Street (CSAH 82) is a preferred alignment for multimodal accommodations as there is an existing grade separated crossing at TH 7, thus eliminating potential conflicts with vehicles on the highway. The proposed project includes the construction of a multi-use trail along Mill Street (CSAH 82) to provide a dedicated facility for people walking and biking. It is anticipated that the proposed project will require the installation of retaining walls to accommodate the surrounding topography, along with the relocation of existing overhead utilities to ensure an obstruction-free facility for users. This facility will connect users from Chanhassen, Shorewood, and Excelsior to the Downtown Excelsior Area that includes numerous places of interest. In addition, this project will provide an indirect connection to the Lake Minnetonka Regional Trail that extends from Victoria to Hopkins. This project was requested by the Cities of Shorewood and Excelsior in 2017. The City of Shorewood completed a feasibility study in 2013 that evaluated the potential for a multi-use trail for the segment of CSAH 82 (Mill Street) within their city limits. The City of Excelsior began a feasibility study in 2019 for the portion within their city limits, which is anticipated to be completed in 2021. Additionally, county staff is collaborating with the City of Chanhassen and Carver County to address a one-block gap in the multi-use trail system on the southern end of the project that extends beyond the Hennepin County boundary. As February 16, 2023, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$3,200,000.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2024
Mill St, Excelsior, MN
Related To This Project
Excelsior, MN
--
Excelsior, MN
Bid Date: Jun 16 2021
Excelsior, MN
Bid Date: May 07 2024
Excelsior, MN
Bid Date: Jun 13 2024
Excelsior, MN
Bid Date: Oct 15 2024
Excelsior, MN
Bid Date: Sep 26 2024
Excelsior, MN
Bid Date: Sep 26 2024
Excelsior, MN
Bid Date: Sep 26 2024
Excelsior, MN
Bid Date: May 11 2022
Excelsior, MN
Bid Date: Sep 28 2023
Excelsior, MN
Bid Date: Oct 03 2023
Excelsior, MN
--
Excelsior, MN
--
Excelsior, MN
Bid Date: Feb 23 2022
Excelsior, MN
Bid Date: Nov 30 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.