EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2019 at 7:00 PM

Updated May 15, 2025

Renovation of an educational facility in Greenwich, Connecticut. Working plans call for the renovation of a educational facility.

Greenwich Public Schools reserves the right to reject any and all bids not deemed to be in the interest of the Greenwich Public Schools. The work of the Contract includes but not limited to the following: Base Bid, Alternates, and Allowances All front end documentation, schedules, submittals, field measurements and preparation of shop drawings, followed by ordering of piping and equipment. Scoping of work area Scaffolding or operable lift sequencing. Removals. Concrte repairs New metal cladding system New Windows - Partial ALT. New doors and framed opening structures ALT New Overhead Doors ALT Removal and reinstallation of fire alarm and security/exit devices. Sealants. Painting Cutting and Patching. Temporary Protection of openings and work areas . Provision of close out documents, including but not limited to as-builts, operations manuals and warranty /guarantees. Provision of close out documents, including but not limited to as-builts, operations manuals and warranty /guarantees. Start of Construction: 1. PHASE 1 Administrative a. Start Date: Letter of Award a) Tasks: Schedule of Values, Progress Schedule, Contracts, and Bonds and Insurance. b. Completion Date: March 13, 2019 2. PHASE 2 Window Shop Drawings: Field verification of existing conditions, shop drawing production, ordering of materials and equipment. a. Start Date: March 15, 2019 or earlier through April 12th, 2019. a) Tasks: Shop Drawings - Windows 3. PHASE 3 Construction through Completion a. START DATE: June 26, 2019 b. TASKS: Window Installations and related work c. COMPLETION DATE: September 3, 2019 C. Project paperwork Completion Date: November 30, 2019

Final Planning

Educational

$800,000.00

Public - City

Renovation

14

16

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Allowances, Administrative Requirements, Special Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Manufacturer?s Field Services, Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes, Wood Shingles, Roofing and Siding Panels, Composite Roof Panels, Composite Wall Panels, Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Windows, Aluminum Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Terrazzo Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Awnings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
471
Active Projects
245
Bidding Soon
4,728
All Active Projects
1,959
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2019

April 8, 2019

img_map_placeholder

10 Hillside Rd, Greenwich, CT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.