Published April 8, 2019 at 8:00 PM

Updated June 11, 2025

Site work for a water / sewer project in Norwich, Connecticut. Completed plans call for site work for a water / sewer project.

The date of the general bid opening will be made at least 30 days from the publication of the formal advertisement. All bidding is by sealed bids and bids received will be safeguarded until publicly opened. The Contract generally consists of the installation of approximately 9,800 linear feet of water main piping and appurtenances within CT Route 97 between the City of Norwich and Town of Sprague, Connecticut. Questions regarding this bid must be submitted in writing to William R. Hathaway, Purchasing Agent, at whathaway@cityofnorwich.org or by facsimile to (860) 823-3812, no later than March 20, 2019 at 2:00 PM EST. Answers will be provided no later than the end of business on March 28, 2019. Addenda to bid documents may be issued up to 5 days prior to the bid opening and will be posted on the City of Norwich and State of Connecticut websites. It is the responsibility of bidders to view all addenda. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the State of Connecticut Drinking Water State Revolving Fund. Neither the State of Connecticut nor any of its Departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. This procurement will be subject to the requirements contained in subsections (h), (j) and (o) of Section 22a-482-4 of the RCSA. The Bidder for this project shall hold and provide evidence of a current DAS contractor pre-qualification certificate (not a predetermination letter) for "Site Work" or "Sewer and Water Lines" from the Department of Administrative Services (DAS) of the State of CT according to CGS Section 4b-91. Bidders shall submit with their bids copies of DAS contractor prequalification certificates along with the current Update Bid Statements. In addition, any named subcontractor whose subcontract value is greater than $500,000 shall hold a current DAS Contractor Prequalification Certificate in the closest applicable classification of the work that the subcontractor will complete in the contract. The bidder must submit with their bid, all applicable Subcontractor DAS Prequalification Certificates. Any bid submitted without a copy of the DAS Prequalification Certificate and an Update Bid Statement for the bidder and DAS Prequalification Certificate for Subcontractors whose subcontract value is greater than $500,000 shall be invalid. Bid surety in the form of cash, a certified check or bid bond in the amount of five percent 5% of this bid is required. The successful bidder shall also furnish a 100% Performance Bond and a 100% Payment Bond. The successful bidder shall be required to submit documentation that all employees to be employed in the work subject to this bid have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least ten (10) hours in duration. Any employee found on a worksite subject to this section without documentation of successful completion of a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least ten (10) hours in duration shall be subject to immediate removal. Contracts for work under this Proposal will obligate the Contractor and Subcontractors not to discriminate in employment practices. Attention is called to the fact that no less than the minimum salaries and wages as set forth in the contract documents must be paid on this project. Responding bidders must ensure that employees and applicants for employment are not discriminated against because of their race, color, religious creed, age, marital status, national origin, ancestry, sex, gender identity or expression, intellectual disability, mental disability or physical disability, including, but not limited to, blindness, unless it is shown by such bidder that such disability prevents performance of the work involved. Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) policies of the State of Connecticut are applicable to this Contract. The fair share construction goals for minority business enterprise (MBE) and women's business enterprise (WBE) participation for this contract is a minimum of three percent (3%) MBE participation and five percent (5%) WBE participation, applicable to the total dollars paid to the SRF loan funded portion of this contract. The Bidder shall take all affirmative steps necessary to achieve this goal, and shall provide reports documenting the portion of contract and subcontract dollars paid to minority and women owned businesses, and its efforts to achieve the goals, with each invoice submitted or at such greater intervals as specified by the Owner. The bidder shall require similar reports from its subcontractors. Failure to meet or exceed the required percentage shall render a bid non-responsive and cause the rejection of the Bid. Clean Water Fund Memorandum 2016- 003 (CWFM) dated May 25, 2016 must be completed and submitted with the Bid, or that Bid will be deemed nonresponsive. Norwich Public Utilities reserves the right to reject any or all bids, in whole or in part, to award any item, group of items, or total bid, and to waive any informality in the bids received if it deems it to be in the best interest of the Norwich Public Utilities to do so. No Bidder may withdraw their bid within 120 days after the actual date of bid opening thereof. Should there be reason why the contract cannot be awarded within the specific period, this time may be extended by mutual agreement between the City and the designated, qualified low Bidder. Owner and/or Engineer may make such investigations as deemed necessary to determine the ability of Bidder to perform the work and the Bidder shall furnish to Owner all such information for this purpose as Owner may request. Bid will be awarded to the low, responsive and responsible/qualified Bidder. No award will be made to any Bidder who cannot meet all of the following requirements. Bidder: a. Shall not have defaulted on any contract within three years prior to the bid date. b. Shall maintain a permanent place of business. c. Shall have adequate personnel and equipment to perform the work expeditiously. d. Shall have suitable financial status to meet obligations incident to the work. e. Shall have appropriate technical experience satisfactory to Owner in the class of work involved. f. Shall be registered with the Secretary of the State of Connecticut to do business in Connecticut. g. Shall not have failed to perform satisfactorily on contracts of a similar nature. h. Shall not have failed to complete previous contracts on time. The Contract Time shall commence twenty (20) days following the Effective Date of the Agreement and the contractor shall fully complete all work called for under the contract agreement in all parts and requirements within 180 calendar days (excluding any days between December 1 and March 31 if applicable). Liquidated damages in the amount of $500 per calendar day shall be assessed upon failure to meet the milestone dates stipulated, in addition to substantial and final completion dates. To the extent that time lines may overlap, the assessment of liquidated damages will be limited to the contractually prescribed rate of $500 per calendar day. Bidders are hereby notified that the award of the contract for construction of this project is contingent upon the Owner's receipt of approval of authorization to award construction contract from the State Department of Public Health, and funding commitment from the State of Connecticut. It is the intention of the Owner to award the Contract to the low, responsive and responsible/qualified bidder. Federal Minimum Wage Rates (Davis-Bacon), including reporting requirements as determined by the United States Department of Labor under the Davis-Bacon Act apply to this project. State of Connecticut prevailing wage rates also apply to this project. When there is a conflict between the Federal and State Wage Rates, the higher wage rate shall apply. Bidders and subcontractors are required to ensure equal opportunity employment as noted in the Governor's Executive Orders 3, 16 and 17. Bidders on this work will be required to comply with the President's Executive Order No. 11246 and any amendments or supplements to that Executive Order. All final awards of the bid subject to comply with Ordinance No. 1235 adopted December 3, 1991. All bids must be submitted in a sealed envelope bearing the bidder's name and bid number. Responding bidders must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, age, handicap, familial status, sex, or national origin Project Address/Location: Along Route 97 from Old Canterbury Turnpike in Norwich to southern Sprague

Bid Results

Water / Sewer

$2,492,120.00

Public - City

Site Work

21

1

6

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
816
Active Projects
409
Bidding Soon
4,286
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2019

May 6, 2019

Project location map

To Be Determined, Norwich, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.