Site work and paving for a road / highway in Stanford, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Montana Department of Transportation (MDT) is accepting bids for Overlay and Chip Seal Grave Creek North and Eureka South Kalispell Area. Questions or information relating to either specifications or requirements of this Invitation for Bid shall be asked through the eMACS Q&A Board. Potential bidders must log into eMACS to submit a question on the Q&A Board. Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 10,004 tons of 1/2 " Commercial Plant Mix Grade S PG 64-28 asphalt mix material. A leveling course in areas to be determined of up to 250 tons per mile shall be placed and compacted prior to placing a .15' thick and approximately 41-47' wide overlay. Contractor shall provide all labor, equipment, materials, traffic control and incidentals necessary to produce, haul, place, roll and broom approximately 89,115 square yards of laid-in-place chip seal. The chip seal will be approximately 3.77 miles long and 40-46 feet wide. Contractor shall provide CHFRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each work day as determined by the Project Manager. The emulsion application rate for chip seals is estimated at .45 gallons per square yard. The cover material application rate is estimated at 25 pounds per square yard. Actual application rates will be based on the chip design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs prior to the chip seal. The Department will provide final striping. Contractor is responsible for test trailer, transport, and setup if required. If the Department decides to perform testing at an area lab, this bid item will be deleted from the contract. The quantity is estimated and will be changed accordingly depending on pickup and delivery locations and miles transported. A fog seal will be applied at the rate of 0.15 gallons per square yard of 50/50 cut asphalt emulsion CSS-1H. The Department will provide interim and final striping. Question Submission Close Date: 3/28/2019 3:00 PM MDT

Award

Roads / Highways

$1,552,529.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
4
Bidding Soon
46
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2019

July 1, 2019

Project location map

Multiple Locations, Stanford, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.