BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2019 at 8:00 PM

Updated May 21, 2025

Site work, paving and new construction of a mixed-use development in Breaux Bridge, Louisiana. Completed plans call for the construction of a 1,800-square-foot, one-story above grade educational facility; for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project Description: The Project consists of the Includes labor and material for the construction of a two classroom building and new parking upgrades. Also includes the removal and replacement of floors in the existing Gym and (03) existing classrooms as well as new paint in the existing Gym. Construction Time: 120 consecutive calendar days Bidders will be required to provide Bid security in the form of a Bid Bond of a sum not less than 5 percent of the Bid Amount plus all additive alternates. Bid Bond must be written by a company licensed to do business in Louisiana and payable to the St. Martin Parish School Board. The successful Bidder shall be required to furnish a Performance and Payment Bond written by a company licensed to do business in Louisiana, in an amount equal to 100% of the contract amount and who is currently on the U.S. Department of Treasury Financial Management Service List and complies with R.S. 38:2219. The bond shall not be accepted if written for an amount exceeding the amount listed in the Treasury Financial Management Service. The bond shall be countersigned by a person who is under contract with the surety company or bond issuer as an agent of the company or issuer, and who is licensed as an insurance agent in this State, and who is residing in this State. This project is classified as a General Construction project and the Bidder certifies that he meets all licensing requirements of the State of Louisiana and is duly and currently licensed under LA. R.S. 37:2150-2164. No bid may be withdrawn for a period of forty-five (45) days after receipt of all bids. The owner reserves the right to reject any and all bids and to waive any informalities incidental thereto. Vendors submitting bids electronically are required to provide the same documents as vendors submitting through the mail or by hand delivery. Regardless of the bid results, the vendor will have 48 hours from opening of the bids to provide the St. Martin Parish School Board the original documents. If a certified check, or cashier's check, is submitted as the bid security, electronic copies of both the front and back of the check shall be included with the electronic bid. If a vendor fails to provide the original hard copies of these documents within 48 hours of the bid opening, their bid shall be considered non responsive.

Award

Educational

$563,800.00

Public - County

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
6
Bidding Soon
269
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2019

May 3, 2019

Project location map

2439 Main Hwy, Breaux Bridge, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.