BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2024 at 8:00 PM

Updated May 21, 2025

Site work and paving for a mixed-use development in Breaux Bridge, Louisiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

All questions relating to Part A of this project shall be directed to Ronald (Beau) Desormeaux III, PE, with Domingue, Szabo, & Associates at beaud@dsaengineering.com or 337-23-5182, ext. 206 All questions relating to Part B of this project shall be directed to Adam Latiolais, PE, with A&E Consultants, Inc.at adam@aeconsultantsinc.com or 337-332-0649. The work is split into two separate projects in two locations. Part A of this project consists of approximately 0.44 miles of street improvements on Gary Drive, including roadway reconstruction, base construction, asphaltic concrete surfacing., and all necessary to complete work as per plans and specifications. Part B of this project consists of geometry improvements at the intersection of Dell Drive and Parkway Drive, including roadway construction, base construction, asphaltic concrete surfacing, drainage improvements, and all necessary to complete work as per plans and specifications. Each proposal shall be accompanied by Bid Bond, a Cashier's Check, Certified Check or Letter of Credit in the amount not less than five percent of the total bid price and shall be made payable to the City of Breaux Bridge without condition. This shall be given as a guarantee that the Bidder will execute the Contract, if it be awarded to him, in conformity with the contract documents Owner reserves the right to reject any or all bids for just cause; such actions will be in accordance No bidder may withdraw his/her bid within forty-five (45) days after the actual date of the opening thereof. Any person with disabilities requiring special accommodations must contact the Owner no later than seven (7) days prior to bid opening. The Contractor shall begin mobilization and procurement of materials within ten (10) working days of the receipt of the Notice to Proceed and will complete the work, ready for use, in the manner specified in the Contract Documents, within 90 calendar days.

Bid Results

Roads / Highways

$626,680.00

Public - City

Paving, Site Work

26

10

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
29
Bidding Soon
643
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

October 4, 2024

Project location map

Dell Dr, Breaux Bridge, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.