BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Easton, Maryland. Completed plans call for the renovation of a educational facility.

The Contractor shall furnish all labor, equipment, materials and appurtenances as necessary for the replacement of the specified door hardware within Easton Middle School and Easton High School, Talbot County Public Schools, Maryland, as described in the specifications; and as directed by the Plant Operations Manager The subsequent Contract period, resulting from the RFQ process, shall be determined by the owner and the successful contractor. The estimated time frame in which this work will be completed will be between June 17, 2019 and August 9, 2019. The Contractor shall maintain Workers Compensation and Occupational Disease Disability Insurance on all its employees as required by the laws of the State of Maryland, and will maintain Property Damage and Public Liability Insurance to the maximum limit of $1,000,000.00 covering the work of all its employees during the performance of the service(s). A Certificate of Insurance shall be provided to the Plant Operations Department at the time this agreement is signed and before work can commence. Contractors finding discrepancies or omissions in the RFQ or having any doubts as to the meaning or intent of any part thereof, shall submit such questions or concerns to Kevin Shafer, Plant Operations Manager, Talbot County Public Schools, at kshafer@talbotschools.org. Questions should be addressed via email no later than March 15, 2019 to: Kevin Shafer, Plant Operations Manager, at kshafer@talbotschools.org

Post-Bid

Educational

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
77
Bidding Soon
1,809
All Active Projects
740
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2019

June 17, 2019

img_map_placeholder

Multiple Locations, Easton, MD

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.