Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Concordia, Kansas. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
https://www.bladeempire.com/news/commission-approves-water-main-extension COMMISSION APPROVES WATER MAIN EXTENSION A plan to extend the water main in the South Development, and modifying a city ordinance that would allow golf carts and utility vehicles to drive on city streets, were some of the discussion and action items at the regular meeting of the city commission on Wednesday. City manager Amy Lange presented a proposal for extending the water main in the South Development to the city commission. When the flood control project was designed and constructed (2011-2016), several lots were graded to ensure they were at or above the height of the 21st Street dam, and utilities were extended in anticipation of future commercial development in the area. This area was dubbed "South Development." However, four tracts adjacent to US Highway 81/ Lincoln Street were not served with water. Pizza Hut is connected to the water main on the east side of US Highway 81/Lincoln Street. Taco John's ultimately connected to the former Shady Lake Motel's service line after several unsuccessful attempts to bore under US Highway 81/ Lincoln Street. The three tracts between Taco John's and College Drive are not currently served. Lange said that recent conversations with the owner of the tract immediately south of Taco John's revealed development of this tract is imminent; therefore, there is an urgent need to provide water to this site. She said that, based on experience with the Taco John's development, the city does not believe that boring under US Highway 81/ Lincoln Street would be successful. The solution is to extend an 8-inch water main from 21st Street to College Drive. The current estimated cost of this water main extension is $240,170 and includes design and construction observation valued at $26,000. The property owner's pro-rated share is estimated at $55,000. The remaining cost would be borne by the city, with a pro-rated portion to be recovered at the time Lots 1 and 2 are developed. The city's share of funding would be $65,170 from the capital improvement plan (CIP) and $120,000 from the water fund. The next steps include entering into a design contract with an engineering firm, completing the design work, obtaining design review and approval from the Kansas Department of Health & Environment (KDHE), bidding the work, and constructing the water main extension. This work may need to be done simultaneously with the private development construction on this site in order to meet the targeted business opening date. After a brief discussion, the commission approved entering into a professional services agreement with Campbell & Johnson Engineering to begin design work on this project immediately. In other action, the city commission voted to approve amending Ordinance No. 2022-3189 to allow the operation of work-site utility vehicles, golf carts, and micro-utility trucks on city streets. The commission had requested that city staff consider updating this ordinance to allow golf carts on city streets for those who drive their golf carts from their homes to the golf course. Additionally, with the recent and significant increase in fuel prices, there is increased use of work-site utility vehicles, micro trucks, and golf carts on city streets. The city commission reviewed a draft ordinance during a study session on July 6, 2022, and requested the addition of an annual registration requirement, including a $25 registration fee to cover administrative expenses and supplies. During the registration process, the requirements of verification of vehicle ownership, insurance, and driver's license will be verified, and a registration sticker and numbered orange flag will be issued with the expectation they will be affixed to the vehicle. Owners will be responsible to ensure their vehicle is properly equipped and insured to operate on the road per the ordinance. The commission specifically excluded lawn mowers from this ordinance, choosing instead to rely on the standard traffic ordinance for enforcement of the use of lawn mowers on city streets. During the information session, the city commission reviewed updates and bids on replacing the Christmas tree for the Broadway Plaza. The current 14-foot-tall tree, purchased in 2017, suffered significant damage during the windstorm last year. ________________________ The project will include pavement replacement and repair of concrete of the south bound lanes of U.S. 81 from 400 feet north of Walmart entrance to the south city limits. As of October 12, 2020, this project is in the design phase. An engineer has been selected for the project. Bidding is estimated to take place in Dec 2020/January 2021 and construction is estimated to start in March of 2021. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Conceptual
Roads / Highways
$899,157.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 26, 2022
US-81, Concordia, KS
Related To This Project
Concordia, KS
Bid Date: Apr 20 2021
Concordia, KS
Bid Date: Mar 08 2023
Concordia, KS
Bid Date: Feb 21 2023
Concordia, KS
Bid Date: Apr 19 2023
Concordia, KS
Bid Date: Jul 19 2023
Concordia, KS
Bid Date: Sep 20 2023
Concordia, KS
Bid Date: Nov 17 2021
Concordia, KS
Bid Date: Feb 18 2022
Concordia, KS
Bid Date: Jun 27 2022
Concordia, KS
Bid Date: Jun 09 2022
Concordia, KS
Bid Date: Apr 22 2022
Concordia, KS
Bid Date: Mar 28 2022
Concordia, KS
Bid Date: Dec 02 2022
Concordia, KS
Bid Date: Nov 29 2022
Concordia, KS
Bid Date: Oct 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.