EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 22, 2019 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Harleysville, Pennsylvania. Completed plans call for site work for a water / sewer project.

For Harleysville Wastewater Treatment Plant (WWTP) Stage 1 Blower Upgrade The work is generally described as: The removal of two packaged air blowers (60 HP) at the Harleysville Wastewater Treatment Plant and replacement with two owner supplied packaged air blowers (100 HP) containing new enclosures and controls. Work will also include associated site work, electrical work, and modifications to the air piping. This Project was financed by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority. All Contractors shall comply with the Nondiscrimination/Sexual Harassment Clause as required by the Commonwealth. Each bid must be accompanied by a bid bond or a certified check in an amount not less than ten percent (10%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. No bid may be withdrawn for the period of days stated in the bid form from the date the bids are opened. The successful bidder will be required to furnish satisfactory Performance and Payment Bonds in the amount of 100% of the Contract amount and a Maintenance Bond in the amount equal to fifteen percent (15%) of the contract amount, thereafter required on the specified Bond Forms included in the Contract Documents and Waiver of Lien. The right is reserved to waive any informality in the Bid, to reject any or all Bids, and to accept any Bid which is deemed most favorable to the Owner, at the time and under the circumstances stipulated. The work in this contract shall be paid for in accordance with the Pennsylvania Prevailing Wage Act (Act No. 442).

Award

Water / Sewer

$68,000.00

Public - City

Site Work

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Payment Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Operation and Maintenance of Sewer Utilities, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping, Gas and Vapor Process Piping, Liquids Process Piping

Find More Local Projects

Within 75 Miles of This Project
470
Active Projects
238
Bidding Soon
3,963
All Active Projects
1,890
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2019

May 24, 2019

img_map_placeholder

650 Main St, Harleysville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Harleysville Wastewater Treatment Plant (WWTP) Stage 1 Blower Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.