BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2019 at 8:00 PM

Updated February 8, 2025

Renovation of a development in Bay City, Texas. Completed plans call for the renovation of a development.

Furnish all labor, equipment, materials, and incidentals necessary to construct one (1) new preengineered metal building, which includes but is not limited to: site utilities and ADA accessible parking area, in accordance with the Bidding and Contract documents. Bid Option No. 1: Furnish all labor, equipment, materials, and incidentals necessary to provide additional paving, striping and wheel stops as shown on detail drawing sheet number 01/A0.0 The Owner may exercise its Option to direct this additional work at the Bid Amount within 30 days of the Authorization to Proceed with Construction Activities. Additive Alternate No. 1: Furnish all labor, equipment, materials, and incidentals necessary to provide roll-up shutters at locations noted on Elevations, drawing sheet number A3.0, in accordance with the Bid and Contract Documents. Additive Alternate No. 2: Furnish all labor, equipment, materials, and incidentals necessary to provide furniture as scheduled or similar. Reference Furniture schedule 17, drawing sheet number A4.0, in accordance with the Bid and Contract Documents. Additive Alternate No. 3: Furnish all labor, equipment, materials, and incidentals necessary to construct concrete site wall. Reference Architectural floor plan, drawing sheet number A1.0 and structural detail, drawing sheet number 3/S3.1, in accordance with the Bid and Contract Documents. Performance Period: All work shall be completed within Two Hundred Ten (210) calendar days commencing on the date specified in the Notice to Proceed. Although the pre-bid conference is not mandatory, Bidders are strongly encouraged to attend as important information regarding Bidding requirements and the Project will be discussed. Failure to give proper consideration to site conditions when preparing the bid will not constitute grounds for additional compensation. For technical information, direction to the site for pre-bid conference, and information regarding administration of the contract, contact Contract Manager, Gisela Alanis, at 512-389-4480 or gisela.alanis@tpwd.texas.gov The estimated range of construction cost is $420,000.00 to $475,000.00. For questions, call HUB Staff, 512/389-4784.

Award

Conservation and Development

$449,068.00

Public - City

Renovation

30

1

10

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
137
Bidding Soon
2,913
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2019

June 17, 2019

Project location map

To Be Determined, Bay City, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.