BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in San Diego, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Montezuma Ppl/mid-city Pipeline Ph 2:The City's Public Works Department is planning to install roughly 1.0 miles of new water pipeline, which consists of approximately 4,880 linear feet of new 66" diameter CML&TC steel transmission main and 420 linear feet of 8-inch PVC distribution main. Work also includes 2,530 linear feet of 16-inch cast iron pipeline abandonment, as well as, associated required street ADA improvements and paving. The 66-inch transmission main will run southward from the Alvarado Water Treatment Plant (AWTP) to the intersection of 69th and Mohawk Street. The north terminus of the pipeline will be connected to existing Valve Vault No. 3 located where the Earl Thomas Reservoir Outlet Pipeline intersects the Clear Wells Interconnection Pipeline. The south terminus will connect to the Mid-City Phase 2A Pipeline just easterly of the 69th and Mohawk Street intersection. Additionally, in the Helix Water District, Work also includes the relocation and construction of a new 8-inch PVC Distribution Main running along Lake Murray Blvd north of Wisconsin Ave, its Water services, and all other work shown on plans and specifications. Lastly, in the City of La Mesa, work includes the removal of an 8-inch Sewer pipeline. Alernate A:If Alternate A is awarded, the contractor shall perform additional Work on the replacement of8-inch Cast Iron Sewer Line within the City of La Mesa ROW in accordance to the Bid Scheduleand Plans numbered 37333-78-D through 37333-81-D (LM-1 through LM-4) for the Montezuma PPL/Mid-City Pipeline Ph2 project. Alernate B:If Alternate B is awarded, the contractor shall deduct overlay and striping Work within the City of La Mesa ROW originally shown in the base Bid for Montezuma PPL/Mid-City Pipeline Ph2 in accordance to the Bid Schedule. 70th-alvarado to Saranac-sidewalk:This portion of the project proposes to install new concrete sidewalk on the west side of 70th street between Alvarado Road and Saranac Street. The work is to include installation of new 4' and 5' wide concrete sidewalk, curb and gutter, retaining walls, pedestrian push buttons, chain link fencing, bike lane striping, traffic and signing, and relocation/adjustment of pedestrian barricade and signs. The Work shall be performed in accordance with: 1.1.1. The Notice Inviting Bids and Plans numbered 37333-01-D through 37333-89-D, inclusive, and Traffic Control Plans numbered 37333-T1-D through 37333-T71-D, for Montezuma PPL/Mid-City Pipeline Ph 2 inclusive.1.1.2. The Notice Inviting Bids and Plans numbered 40522-01-D through 40522-07-D for 70th Alvarado to Saranac-Sidewalk, Inclusive. 1.9. Contractor and Subcontractor Registration Requirements. This project is subject to compliance monitoring and enforcement by the DIR. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid or proposal, subject to the requirements of section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualifiedto perform public work pursuant to Labor Code section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.1.9.1. A Contractor's inadvertent error in listing a subcontractor who is not registered pursuant to Labor Code section 1725.5 in response to a solicitation shall not be grounds for filing a bid protest or grounds for considering the bid non-responsive provided that any of the following apply: (1) the subcontractor is registered prior to bid opening; (2) within twenty-four hours after the bid opening, thesubcontractor is registered and has paid the penalty registration fee specified in Labor Code section 1725.5; or (3) the subcontractor is replaced by another registered subcontractor pursuant to Public Contract Code section 4107. 1.9.2. By submitting a bid or proposal to the City, Contractor is certifying that he or she has verified that all subcontractors used on this public work project are registered with the DIR in compliance with Labor Code sections 1771.1 and 1725.5, and Contractor shall provide proof of registration for themselves and all listed subcontractors to the City at the time of bid or proposal due date or upon request. 10. SUBCONTRACTING PARTICIPATION PERCENTAGES: Subcontracting participation percentages apply to this contract.10.1. The City has incorporated mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participation percentages based upon certified SLBE and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages:1. SLBE participation 9.1%2. ELBE participation 13.2%3. Total mandatory participation 22.3%10.2. The Bid may be declared non-responsive if the Bidder fails to meet the followingrequirements:10.2.1. Include SLBE-ELBE certified subcontractors at the overall mandatory participation percentage identified in this document; OR10.2.2. Submit Good Faith Effort documentation, saved in searchable Portable Document Format (PDF) and stored on Compact Disc (CD) or Digital Video Disc (DVD), demonstrating the Bidder made a good faith effort to outreach to and include SLBE-ELBE Subcontractors required in this document within 3 Working Days of the Bid opening if the overall mandatory participation percentage isnot met. This Contract Will Be Subject to the Following: - Phased-funding- the City's Subcontracting Participation Requirements for Slbe Program- Eligible for Joint Venture Prequalification Status (See Instructions to Bidders)- Prevailing Wage Rates: State Federal- Apprenticeship Response Format: Electronic Only Type of Award: Lump Sum License Requirements:A, C-57 (well drilling), C-27 (LTMMA) Liquidated Damages:$1,000 Online Q&A No Bid Valid:120 Calendar Days

Award

Water / Sewer

$33,443,227.00

Public - City

Paving, Site Work

337

30

33

7

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2019

August 19, 2019

img_map_placeholder

Multiple Locations, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.