Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 10, 2019 at 8:00 PM
Updated April 5, 2024
Site work for a bridge / tunnel in Maple, Ontario. Completed plans call for site work for a bridge / tunnel.
The Work includes, but is not limited to, cured in place culvert design and rehabilitation at two locations on Keele Street in the City of Vaughan: 1. Cured in Place culvert design and rehabilitation of the existing 35.74m x 1200mm and 37.41m x 1200mm CSP cross culverts on Keele Street, 100m South of Teston Road. 2. Cured in Place culvert design and rehabilitation of the existing 29m x 975mm CSP stormwater culvert on Keele Street, 220m south of Bowes Road Documents and addenda may be obtained at: https://york.bidsandtenders.ca Project is subject to final approval.
Award
Bridges / Tunnels
$324,499.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2019
May 30, 2019
Keele St, Maple, ON
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
