BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Lexington, South Carolina. Contact the soliciting agency for additional information.

Awarded Supplier: Carolina Materials Corp Question Deadline: 4/16/2019 04:00 PM (ET) This contract would only be used for backup or in case there was a County natural disaster. The successful contractor shall provide all equipment and manpower to grind wood waste stockpiles into aggregates of sufficient specifications. Grinding must result in a finished product using an adequate screen size to promote wood waste mulch, boiler grade wood chips and/or other marketable grades (maximum chip size 3"). Should pieces become too large, due to mechanical problems; the County can request a second grind, at no additional cost. Mulched material is to remain onsite. Grinding services will be required as backup to Solid Waste Management's grinding operations or as may be deemed necessary by the County for disaster cleanup. The contractor shall utilize equipment, including grinding and mulching equipment sufficiently sized to process the volume of material requested in a reasonable time frame. The equipment must be equipped with a magnetic head to collect loose nails. The Contractor shall provide such equipment sufficient to maintain, sort, move, and stock pile unprocessed, processed and contaminated materials; and support equipment including fueling, spare parts, tools, chain saws, etc. to ensure that all materials are processed in a timely manner. The contractor should exercise due care to minimize disturbance or damage to the general property and the contractor will be responsible to repair any damage, to clean up the area and regrade the area if necessary. The amount of material to be reclaimed under this contract is estimated and not guaranteed. The contractor may be requested to grind more or less than the estimated quantity of materials. Pricing will be based on aggregate processed by the ton. The unit price shall be all inclusive including mobilization costs. The wood material to be ground includes clean yard waste, pallets, construction wood and clearing debris, however, Lexington County will not assume liability for damages caused by foreign material that may be mixed in. The contractor is responsible for the separation of potentially damaging materials. The County will be responsible for disposal of any foreign material such as rock, metal, etc. Hours available for the grinding operation are: Monday through Friday - 7:00 am - 5:00 pm with the exception of County holidays (New Years Day, Independence Day, Thanksgiving Day and Christmas Day). In an emergency situation, other hours required to process material may be considered Safety requirements - The Contractor must abide by all Federal, OSHA, State and County safety regulations, including the requirement for all personnel operating at the Edmund Facility to wear safety green shirts, vests, etc. at all times.

Award

Municipal

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
116
Bidding Soon
1,380
All Active Projects
605
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 24, 2019

May 24, 2019

img_map_placeholder

Multiple Locations, Lexington, SC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.