BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, renovation and addition to a mixed-use development in Farmington, Illinois. Completed plans call for the addition of a 3,400-square-foot, one-story above grade educational facility; and for the renovation of a 3,941-square-foot, one-story above grade educational facility.

Project #1: The Fitness Area Addition & Renovation and the new construction of the Locker Room and Concession building. i. Building Addition - Approximate 3,400 sf Fitness Area addition and adjacent interior renovation. Includes site improvements, masonry shell, with steel joists, standing seam roofing, typical interior finishes, and MEP work. ii. New Construction - Approximate 3,940 sf Locker Room / Concession building. Includes adjacent site demolition and site improvements as well as a masonry load bearing building with wood trusses, standing seam roofing, typical interior finishes, and MEP work. Project #2: Renovation of two (2) Existing Toilet Rooms. iii. Includes demolition and renovation of existing toilet rooms within the school. See drawing A130 for an overall view of the two (2) toilet rooms. The construction consists of minor demolition, new masonry walls and infills, typical restroom interior finishes, and MEP work. The multiple bid packages included are as follows: Project #1: Fitness Add.& New Locker Rooms. BP #01 Earthwork, Site Demo, & Storm Sewer, BP #02-Site Water & Site Sanitary, BP #03-Asphalt Paving, BP #04-Site Concrete, BP #05-Building Concrete, BP #06-Steel Fabrication & Erection, BP #07-Masonry, BP #08-Carpentry & Building Demolition, BP #09-Roofing, BP #10-Aluminum Windows & Skylights, BP #11-Framing, Drywall, & Acoustical Ceilings, BP #12-Painting, BP #13-Flooring, BP #14-Lockers, BP #15-Fire Protection, BP #16-Plumbing, BP #17-HVAC, and BP #18-Electrical. The multiple bid packages included are as follows: Project #2: Toilet Renovations. BP #01-Carpentry & Interior Demolition, BP #02-Framing,Drywall, & Acoustical Ceilings, BP #03-Painting, BP #04-Flooring, BP #05-Fire Protection, BP #06-Plumbing, BP #07-HVAC and BP #08-Electrical. Bidders must submit all questions regarding the specifications and invitation for bids, or the exhibits attached thereto, in writing to Beth Schupp at beth@midconpro.com. Replies will be issued to all bidders of record in the form of an Addendum. Questions received after 4:00 P.M. prevailing time on Thursday, April 25th, 2019, cannot be answered. All bids shall be deemed final, conclusive, and irrevocable, and once opened no bid shall be subject to correction or amendment for any error or miscalculation. No bid shall be withdrawn without the consent of the Board of Education after the scheduled closing time for the reception of the bids. Each bidder expressly agrees that such bid may not be withdrawn for a period of forty five (45) days from the opening thereof. Withdrawal within such period shall subject the bidder to forfeiture of Bid Bond, as well as penalties and damages to the District to the extent that such withdrawal results in loss to the District. The Board of Education reserves the right to reject any and all bids or any part thereof, to waive any informalities, errors or irregularity in bids received or in the bidding process, and to accept the bid that the Board of Education deems the most favorable to its interest after all bids have beenexamined and canvassed. The Board of Education will award the contract to the lowest responsible bidder that meets the criteria as established in the specifications and the contract will be awarded only after a formal notice is given to the successful bidder pursuant to action by the Board of Education. Project Location: -108 N. Lightfoot Road Bid Results: Project #1 Bid Package 01 Iron Hustler -120,230 Bid Package 02 PIPCO -42000 Bid Package 03 Tazewell County -52,750 Bid Package 04 Otto Baum -107063 Bid Package 05 Hein -169000 Bid Package 06a Hanley -67000 Bid Package 06b Hanley -121238 Bid Package 07 Masonry MR Mason -334755 Bid Package 08 First Build -219500 Bid Package 09 Western -232778 Bid Package 10 East Moline Glass -60330 Bid Package 11 Wrightway -54610 Bid Package 12 Dragoopt -45200 Bid Package 13 Ccarpet Weavers -31313 Bid Package 15 FE Moran -7900 Bid Package 16 Warner -86480 Bid Package 17 Garber -278800 Bid Package 18 Wilcox -204800 Project #2 Bid Package 01 First Build- 74800 Bid Package 02 BSSC -20500 Bid Package 03 Dragoopt -3600 Bid Package 04 TSI -63970 Bid Package 05 FE Moran -3900 Bid Package 06 Warner -64780 Bid Package 07 PIPCO -13200 Bid Package 08 Laser -42700

Bid Results

Educational

$2,523,197.00

Public - City

Addition, Demolition, Paving, Renovation, Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
53
Bidding Soon
895
All Active Projects
404
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 8, 2019

June 24, 2019

img_map_placeholder

212 Lightfoot Rd, Farmington, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.