BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2019 at 8:00 PM

Updated September 9, 2025

Site work and paving for a mixed-use development in Redwood Falls, Minnesota. Completed plans call for site work for a bridge / tunnel; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Valuation: $600,000 - $700,000 State Project No. 19104 This project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned (VO) preference and has a 3% (TG/ED/VO) subcontracting goal established. SUMMARY OF WORK: The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolish existing structures as specified on drawings. 2. Mill, reinforce and overlay POV parking area. 3. Expand MVSC parking area. 4. Install 7 anti-climber chain link fence and gates. 5. Provide sidewalks, curb, or curb and gutter. 6. Remove existing culvert and install new culvert. 7. Provide POV parking lot striping to include handicap parking stalls. 8. Install parking lot signage as required. Plans and Specifications were prepared by Department of Military Affairs, Facilities Management Office, Mr. Michael E. Rude, Camp Ripley, 15000 Highway 115, Little Falls, MN 5634-4173, Telephone No. 320.616.6157.

Award

Sidewalks / Parking Lot

$648,000.00

Public - Federal

Paving, Site Work

14

10

2

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
31
Bidding Soon
373
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2019

May 31, 2019

Project location map

Multiple Locations, Redwood Falls, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.