BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Jacksonville, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties: Duval Road Name: Jacksonville National Cemetery Access Rd Limits:from Lannie Rd to Arnold Rd Project(S): 42845515201(*) Federal Aid No: D218019b Total Roadway Length: 3.261 Miles Contract Days: 750 Total Bridge Length: 0.165 Miles Total Proposal Length: 3.426 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 15 Days (Acq. Time) The improvements under this contract consist of base work, drainage improvements, curb and gutter, highway signing, guardrail, bridges, sidewalks/bicycle path, and other incidental construction for the Jacksonville National Cemetery Access Road in Duval County from Lannie Road to Arnold Road, for a distance of 3.426 miles. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects unless noted otherwise in the project specifications. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT Call Order: 003 - New Road Construction/Bridge Construction

Award

Bridges / Tunnels

$12,559,204.00

Public - State/Provincial

New Construction, Paving, Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
36
Bidding Soon
643
All Active Projects
259
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2019

July 22, 2019

img_map_placeholder

4083 Lannie Rd, Jacksonville, FL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.