BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2019 at 8:00 PM

Updated March 14, 2026

Site work for a civil project in Middleton, Wisconsin. Completed plans call for site work for a water / sewer project.

As of 05/23/2019 No start and end date. The work includes the repair of a wet detention pond south of Donna Drive and east of Parmenter Street, including storm sewer, unclassified excavation, clay liner, gravel access path, articulated concrete block overflow, Platipus Earth Anchoring System, geogrid, placement of riprap, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. There will be no pre-bid conference for this project.No Bid will be received unless accompanied by a surety in a form acceptable to the City equal to at least 5% of the maximum Bid, payable to the OWNER. See Instructions to Bidders on City website for details. The City of Middleton reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids (consisting of up to: 60 days for issuance of Notice of Award; 15 days for Contractor to return signed agreements, bonds and insurance; and 10 days for City execution of agreement). Contract award shall be made based on the lowest responsive and responsible Bidder.

Award

Water / Sewer

$495,934.00

Public - City

Site Work

12

1

16

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
3
Bidding Soon
1,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2019

June 15, 2019

Project location map

Donna Dr, Middleton, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.