BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2019 at 8:00 PM

Updated January 29, 2024

Site work for a civil project in Friendship, Wisconsin. Completed plans call for site work for a water / sewer project.

In general, the project consists of construction of a 4-acre liner including site preparation; mass grading for subgrade preparation and other associated features such as berms; clay borrow excavation and hauling; clay liner soil placement and compaction; HDPE geomembrane, geotextile, and drainage rock placement; infiltration basin construction; leachate collection system; and leachate tank replacement with associated work including loadout system replacement. Bidders must be knowledgeable manufacturer trained Authorized Service Contractors for installation of equipment.

Award

Water / Sewer

$1,353,149.00

Public - County

Site Work

20

1

11

8

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
108
Bidding Soon
755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2019

July 8, 2019

Project location map

To Be Determined, Friendship, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.