Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 2, 2024 at 7:00 PM

Updated February 3, 2024

Site work for a civil project in Friendship, Wisconsin. Completed plans call for site work for a water / sewer project.

In general, the project consists of construction of a 4-acre liner for the construction of Phase 6 including site preparation; clearing and grubbing; mass grading for subgrade preparation and other associated features such as berms; clay borrow excavation and hauling; clay liner soil placement and compaction; HDPE geomembrane, geotextile, and drainage rock placement; infiltration basin construction; and leachate collection system. Bidders must be knowledgeable manufacturer trained Authorized Service Contractors for installation of equipment.

Award

Water / Sewer

$1,891,804.00

Public - County

Site Work

27

19

7

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
55
Bidding Soon
1,206
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

June 9, 2023

Project location map

To Be Determined, Friendship, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed