BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Riviera Beach, Florida. Completed plans call for site work for a water / sewer project.

Berth 1 Bulkhead Replacement Advanced Fender Order. Project consists of the fabrication and delivery of Floating Marine Fenders and appurtenances freight on board (FOB) to the Port of Palm Beach, Riviera Beach, Florida. All questions requiring clarification or interpretation of the Bidding Documents shall be made in writing and shall reach the Engineer at least seven (7) business days prior to the date for receipt of Bids. Do not contact Owner with questions. Direct all requests to the attention of Mr. J. Casey Long, PE, at Kimley-Horn and Associates. Casey.long@kimley-horn.com or 561-840-0838. Each Proposal shall be accompanied by Bid Security in the form of a surety company Bid Bond, cashiers or certified check, drawn upon any State or National Bank in Florida, payable to the Port in an amount not less than five percent (5%) of the amount. Any Proposal received without Bid Security will be rejected and returned. Bid Security will be returned to all except the three lowest Proposer within seven (7) days after the opening of Proposals, and the remaining Bid Securities will be returned within seven (7) days after the Port and the awarded Bidder have executed the Contract, or if no Contract has been awarded, within ninety (90) days after the date of opening of Proposals, or upon demand of Proposer at any time thereafter, so long as it has not been notified of acceptance of its Proposal. The Bond executed by the Proposer shall be issued by a Surety Company licensed to do business in the State of Florida. The Proposer agrees that the Proposal shall be good, and may not be withdrawn for a period ending the later of ninety (90) calendar days after Proposal Opening, or the execution of the Contract between the successful Proposer and the Port. The Port reserves the right to waive any technicalities/irregularities and/or to reject any and/or all Proposals. The Port further reserves the right to award a contract to that Proposer whose submittal best serves the interests of the Port, in the sole discretion of the Port.

Award

Water / Sewer

$119,890.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
54
Bidding Soon
1,114
All Active Projects
507
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2019

May 27, 2019

img_map_placeholder

1 E 11th St, Riviera Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.