BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2019 at 8:00 PM

Updated May 3, 2024

Site work and new construction of a mixed-use development in Shepherdstown, West Virginia. Completed plans call for the construction of a 6,240-square-foot pre-engineered storage facility; for site work for a pre-engineered storage facility; and water / sewer project.

Solicitation Number: 140F0919R0003 Notice Type: Award Contract Award Date: August 30, 2019 Contract Award Number: 140F0919C0002 Contract Award Dollar Amount: $2,030,000.00 Contractor Awarded DUNS: 116957814 Contractor Awardee: GOLDBELT OPERATIONS SUPPORT SERVICES, LLC 13900 LINCOLN PARK DR STE 140 HERNDON VA 20171-3265 US The National Conservation Training Center (NCTC) is an active training facility for the U.S. Fish and Wildlife Service. The NCTC site is a campus setting with multiple buildings, which include lodges, offices, training rooms, a large auditorium, a laboratory, dining facilities, gymnasium, operations support, etc. This is a Design-Build project consisting of all design, labor, equipment and materials necessary to construct a new, fully functioning Wage Grade (WG) Shop. The target building shall be a 156 x 40 pre-engineered metal building with a 16 eave height and interior spaces as indicated on the schematic drawings in accordance with the contract documents. Work shall include providing a geotechnical site investigation and site survey as required to provide the necessary information for the metal building manufacturer to design the building foundation as well as compliance with federal and state sediment and erosion control and stormwater management requirements and permitting. Work shall include providing new domestic water and sanitary connections to the building from nearby campus service lines. Work shall include providing heat to the building by way of hot water radiant floor heating and a propane fired boiler. Work shall include providing electrical and communication services with tie-ins from the Electrical and Comm closests of the nearby Support Services building. Work shall include providing fire protection services to the building per required code, to include an exterior fire hydrant. Fire protection system shall be linked with the existing, campus wide, Siemen alarm system. Work shall include indicated site work, i.e. expanding the existing yard, installation of bin storage (bid option 2), 3-sided pole barn (bid option 3), and water filling station as awarded, and as indicated in the schematic drawings.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$2,030,000.00

Public - Federal

New Construction, Site Work

16

10

8

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
443
Active Projects
191
Bidding Soon
3,017
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2019

November 18, 2019

Project location map

698 Conservation Way, Shepherdstown, WV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.