Published July 19, 2019 at 8:00 PM

Updated January 17, 2025

Site work for a water / sewer project in Corte Madera, California. Completed plans call for site work for a water / sewer project.

**As of June 4, 2019, this project has not yet been awarded. It is expected to be awarded on 6/18/2019. This contract is for furnishing labor and equipment for site preparation, access road excavation, installation of approximately 600 feet of 30-inch, 24-inch, 12-inch, 10-inch and 6-inch welded steel pipe with valves, fittings, concrete vault, air/vacuum valve assembly with vault, pipeline disinfection and appurtenances. The work to be done is located on Marin Municipal Water District watershed lands within the County of Marin, California. The Contractor performing work under this contract shall possess a class A or C-34 Contractor's license which is valid in the State of California at the time the contract is awarded. Within five working days after the bid opening date for this project, the three apparent lowest bidders shall submit a credit report, current within 30 days of the bid opening date for this project. To be considered a responsible bidder on this project, either the Contractor's credit report shall indicate a Dun & Bradstreet credit risk rating of CC2 or better or the Contractor's bank shall issue a financial statement on the form attached as Page VI-a. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to labor Code section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a). No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The prevailing rate of wages in the locality in which work is to be performed has been ascertained by the District and published under the provisions of Section 1773 of the California Labor Code. It shall be mandatory upon the Contractor to whom the contract is awarded and upon any subcontractor under him to pay not less than the said prevailing wage rates to all workers employed by them in the execution of the contract. On this contract, eight hours shall constitute a legal day's work. Work beyond eight hours shall be paid at a rate not less than one and one-half times the prevailing rates. Wage rates for Sundays and holidays shall be paid at a rate not less than two times the prevailing rates. The holidays upon which such rates shall be paid shall be all holidays recognized in the collective bargaining agreement applicable to the particular craft, classification or type of workers employed on the project. Unless otherwise specified, proposals will be considered for the complete job only. In accordance with the Instructions to Bidders, all bid documents must be completed on forms supplied with the contract specifications. Each Bidder is requested to return the entire specification booklet. The Bidder must include a certified check, cash, cashier's check or bid bond executed by an admitted surety authorized by the California State Department of Insurance to transact business in California as a guarantee that the Bidder will, if successful, promptly execute a satisfactory contract and furnish bonds as required by these specifications. The certified check, cash, cashier's check or bid bond shall be not less than ten (10) percent of the total amount of the bid and shall be payable to the Marin Municipal Water District. In compliance with Section 22300 of the Public Contract Code, the Successful Bidder may, at his expense, choose to exercise one of the following options regarding retentions: (1) to deposit securities (under District control) equivalent to the retention amount normally withheld by the District; or (2) to execute an escrow agreement and have the District make retention payments directly to an escrow agent; or (3) to execute a retention agreement indicating that normal retention will be deposited in a joint account under District control. If an escrow agreement for security deposits is used in lieu of retention, it shall be in a form substantially similar to that specified in Public Contracts Code Section 22300. If any of the above options are chosen, the District will withhold no retention on progress payments. District control of securities or accounts will be released in the same manner as release of normal retention funds as indicated in the general specifications. Securities eligible for investment shall include those listed in Section 16430 of the Government Code or bank or savings and loan certificates of deposit. The Bidder's attention is drawn to the General Specifications section regarding Dispute Resolution. This section provides any disputes or claims between the District and the Contractor are subject to mediation, and then if still unresolved, at the sole election of the District, to binding arbitration. The Bidder's attention is also called to Marin Municipal Water District Code Sections 2.90.065 through 2.90.067 which permit the District to disqualify a Contractor from bidding on future contracts with the District if the contractor fails to comply with the rules and regulations specified in the District's code or the requirements for performance specified in this contract including submission of false claims to the District. Bidders should contact their insurance brokers to verify that their insurance meets all insurance requirements of the contract and that their broker will provide a completed MMWD Additional Insured Endorsement. Bidders should provide pages XIV, XIV-a and XIV-b of the contract to their insurance brokers for reference. Bidders who (desire a District representative to accompany them on their first visit to the proposed work site or) have questions regarding the project should contact Alex Anaya at 415-945-1588. The District reserves the right to reject any and all bids and to waive any irregularities in said bids.

Award

Water / Sewer

$441,050.00

Public - City

Site Work

10

1

14

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Assurance, Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Concrete Curing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Postal Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Control Equipment
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
386
Active Projects
183
Bidding Soon
3,182
All Active Projects
1,461
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2019

July 4, 2019

img_map_placeholder

To Be Determined, Corte Madera, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.