Demolition, site work, paving and new construction of a bridge / tunnel in Bristol, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project provides for the furnishing of all labor, material, equipment and work necessary for the removal of an existing single-span steel bridge over the PA Turnpike (I-276) and construction of new two-span steel plate girder bridge. The contract also includes reconstruction of S.R. 2006 approach roadway, realignment of two side roads, utility installations, drainage modifications, signing and pavement markings, temporary traffic signals, and the construction of the mainline median/shoulder at the proposed bridge location. Work items include, but are not limited to: 29,280 CY Excavation, Various Classes 2,265 TON Superpave Asphalt Mixture, Wearing Course, Various Depths 1,895 TON Superpave Asphalt Mixture, Binder Course, Various Depths 3,489 TON Superpave Asphalt Mixture, Base Course, Various Depths 5,516 TON Subbase, (No. 2A), Various Depths 3,437 LF 6" Pavement Base Drain 528 LF Drainage Pipe, Various Sizes and Types 1,675 LF Guide Rail, Various Types 2,396 CY Cement Concrete, Various Classes 5,694 LF Piles, Various Sizes 601,866 LB Fabricated Structural Steel 268,115 LB Reinforcement Bars, Epoxy Coated 72,237 LB Reinforcement Bars Milepost 355.62 is located approximately 5.3 miles east of the Bensalem Interchange, Exit 351 and approximately 1.0 mile west of the Delaware Valley Interchange, Exit 42, in Bucks County, Pennsylvania. The proposal and plans are published electronically in EBS and are available to registered business partners for downloading and printing. An electronic bid bond, from an approved vendor, with corporate surety, in the amount of five (5%) percent of the bid must be submitted with the proposal as bid security. The bid security of the three (3) low bidders will be retained until the execution of the contract. (The normal time for execution of the contract is approximately four [4] weeks.) A Prequalification Certification and Applicable Capacity Rating assigned by the Prequalification Office of the Pennsylvania Department of Transportation is a necessary prerequisite for bidding on this project. The opening and listing of bids not meeting all the terms and conditions of the bid advertisement or bid procedures does not act as a waiver or modification of any requirements contained in the bid advertisement or bid procedure. Network No. 7007100 2 NtoB(T-355.00P002-3-06) The Provisions of the Pennsylvania Prevailing Wage Act of August 15, 1961, P.L. 987, as amended, together with the rates and regulations promulgated by the Secretary of Labor and Industry applicable thereto, shall apply to this contract. Any questions for this project must be submitted electronically in EBS by registered business partners. Cost Code: G $10,000,000.00 $20,000,000.00

Award

Bridges / Tunnels

$11,111,555.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Alternates, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Residential, Collector-to-Tank, Solar-Electric Domestic Water Heaters, Residential, Collector-to-Tank, Heat-Exchanger-Coil, Solar-Electric Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Central Heating Equipment, Solar Energy Heating Equipment
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Dewatering, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 42 - Process Heating, Cooling, and Drying Equipment

Division 42 - Process Heating, Cooling, and Drying Equipment

Process Heating Equipment, Process Heaters, Solar Process Heaters, Industrial Heat Exchangers and Recuperators, Industrial Solar Radiation Heat Exchangers
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
512
Active Projects
308
Bidding Soon
4,708
All Active Projects
2,122
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2019

August 26, 2019

img_map_placeholder

To Be Determined, Bristol, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replacement of Bridge

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.