BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in North Vancouver, British Columbia. Completed plans call for the construction of a 41,979-square-foot, three-story above grade fire / police facility; and for site work for a fire / police facility.

The Maplewood Fire & Rescue Centre (MFRC) Project is located on a 14 acre parcel north of Old Dollarton Road in North Vancouver, BC. Approximately 7.0 acres of the site on the East side was used as a District Landfill for road and development waste material from the 1960's to the late 1980's and is currently undeveloped. The MFRC is to be built on approximately 4.0 acres within the former landfill area. The remaining fill pile area to the North, West, and South of the MFRC site will be rehabilitated with native plantings to restore it to a more natural state. B.D. Hall Construction Corp. ("BD Hall") has been engaged to perform site clearing, excavation and remediation of contaminated materials on the site. The clean-up and excavation work is anticipated to be complete in July of 2021. The MFRC will consist of a main building, training yard (including props and structures), surface parking and circulation designed for 60 parking stalls. The main building will consist of four (4) double-ended apparatus bays attached to three (3) stories of office, classroom, dormitories, and support spaces. The building will be approximately 3,900 m2, constructed to a post-disaster standard, it will also function as a Fire Department Emergency Operations Centre (DOC) for large emergency events and disasters. The training yard is approximately 9,400 m2 and includes areas for parking, fire vehicle driver training, live fire, automobile extrication and physical training. Several building props will be constructed on site for tower and high angle rescue training, commercial and residential mock fire training, and confined space training. The site will be left with rough grading complete, ready for handover and building construction activities to commence at 5.0M geodetic +/- 10 cm. Erosion Sediment Control (ESC) measures will be a key to the success of the project as the area drains into wetlands and watercourses which eventually enter the Park Street marsh and the Maplewood Conservation area to the south of Dollarton Highway. BD Hall has ESC measures in place. A temporary water and electrical connection has also been installed for use during the construction period. The site falls within the traditional territory of several First Nations. An archaeological consultant (Golder) is working on the project team, a Chance Finds Procedure is in place and will be followed during activity on the site. An Archaeological Impact Assessment (AIA) is under development and permits will be in place under the Heritage Conservation Act. During excavation of the building footprint and other areas where excavation extends below the fill pile and into native soils, archaeological procedures will be required following the requirements of the Heritage Conservation Act (see Appendix #2). The construction budget for the MFRC is approximately $31M, however all figures are approximate and are subject to change. Construction of the Fire and Rescue Centre and restoration of the surrounding area is to begin after the site clean-up and excavation work is complete. The building and training yard is scheduled to be ready for use in Spring 2023, at which time the restoration work in the surrounding areas should also be in its final phase. The area to the west of the site is the proposed development known as the Innovation District. The Innovation District development will potentially impact the East side of the property including the driveway, intersection with Dollarton Highway and grading of the east are of the site. Subcontractors, material suppliers and others interested in providing goods or services for this project should contact the pre-qualified general contractors indicated above. Drawings, Specifications and other relevant materials are available at the following link: https://owncloud.dnv.org/owncloud/index.php/s/JsuoB20nDxc4Iao

Award

Fire / Police

$40,202,032.00

Public - City

New Construction, Site Work

242

42

43

2

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
59
Bidding Soon
2,057
All Active Projects
757
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 18, 2021

November 1, 2021

img_map_placeholder

2337 Old Dollarton Rd, North Vancouver, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.