Renovation of a water / sewer project in Whitewater, Wisconsin. Completed plans call for the renovation of a water / sewer project; and water / sewer project.

**This bid has been postponed per Addendum 2.** The project consists of Fuel Storage Tank Replacement. Project work will replace the existing tank monitoring panel with a new Franklin Fueling Systems, Model TS-550 evo, monitoring panel. Provide new electrical and data cabling to connect the panel to a new 6,000-gallon, double walled, steel, above ground storage tank (AST) and all system monitoring and dispensing components. Provide all new conduit and wiring for electrical and signal installation. Provide signal wiring to the nearest network connection, but allow connection of the system into the network by the DMA information technology (IT) department. Salvage and reinstall existing light pole, spill kit, and grounding reel in fueling area. Provide new light emitting diode (LED) luminaire and install on salvaged light pole. Demolish existing fuel island, and construct new fueling island with all required conduit, electrical, and signal wiring to system components. Remove and replace existing fuel dispensing unit with a new Gasboy (Model: Atlas 9153KXTW1) dispenser mounted on structural steel supports for exposed piping and conduits . Provide all fuel supply piping, fittings, connections, filters, and valves required to connect AST to new dispenser. Provide new stainless steel hose reel cabinet with electrically retractable 50-foot hose and intrinsically safe lighting and wiring. Provide pad48 mounted remote filling cabinet with appropriate piping, valves, and connection to AST. Provide all probes and components for measurement of tank contents and dispensing volumes. Provide new grounding bond reel pedestal, emergency stop switch, overfill alarm and acknowledgement switch. Salvage existing heat trace control box and reinstall per plan location with required connections and operations restored to original functioning condition. Provide all electrical and signal wiring, conduit, grounding, commissioning, calibration, and all appurtenances required fora fully functional, code-compliant, turn-key fuel dispensing and monitoring system

Under Construction

Water / Sewer

$206,472.00

Public - State/Provincial

Renovation

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
122
Bidding Soon
1,776
All Active Projects
665
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2019

November 5, 2019

img_map_placeholder

952 Universal Blvd, Whitewater, WI

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.