BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2019 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Morganton, North Carolina. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The estimated construction cost is between $900,000 to $1,000,000. The project involves the demolition of an existing structure, and the installation of approximately 1,300 linear feet of new three-lane roadway with curb and gutter, a 10 multiuse path, and storm drainage facilities on new alignment, including a new traffic signal at the intersection with South Sterling Street, and traffic control. Project contract and performance of work shall be in conformance with the North Carolina Department of Transportation Standard Specifications for Roads and Structures, January 2018 Edition. A vicinity map has been provided for your convenience and reference. All bids must be accompanied by one of the forms of bid security listed in the Bid Summation, references of previous similar projects, and the applicable Affidavit A or B of the Disadvantaged Business Enterprise ( DBE / MBE / WBE ) forms included in the bid packet. Failure to include these items with the bid proposal may be deemed as non-responsive. No bids shall be received after the above-stated time. Federal Funding has been secured to finance this project. Consequently, the wage rates included in the bid packet in the Bid Proposal section must be met by the Contractor for this project. Davis-Bacon requirements shall be enforced for this project and interviews shall be conducted by the administering agency. Three originals of the bid documents shall be delivered to the City by the awarded Contractor for inclusion in and execution of the Contract Documents. If you plan to bid and did not receive your plans directly from the City of Morganton, please be sure that you are on our bidders list. Otherwise, you may fail to get updates or addenda. Please feel free to contact Mark Hall, Design Technician with Development & Design Services for the City of Morganton @ 828-432-2515 or mhall@ci.morganton.nc.us if you have any questions or comments regarding the bid package. The bid listed on the Proposal Sheet shall remain valid for a period of up to 90 days after the bid submittal deadline listed until Notice to Proceed can be given. NCDOT - Connector Road between South Sterling Street (NC-18) and West Parker Road

Project Abandoned

Roads / Highways

$1,305,784.00

Public - City

Paving, Site Work

10

4

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
143
Bidding Soon
1,757
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2019

September 17, 2019

Project location map

S Sterling St & W Parker Rd, Morganton, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.