Renovation of a municipal facility in Soap Lake, Washington. Working plans call for the renovation of a municipal facility.

**As of July 1, 2019, bids were rejected for being over budget, but will rebid later. Furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to construct AMR System Installation. Furnish and install an automated meter reading (AMR) water metering system at locations throughout the City. Work shall include, but not be limited to, the following: A. Furnish and install water meters, registers, and meter transmitter units at the locations shown in the Plans. B.Provide documentation and pictures of each water meter installation. C. Replace water meter boxes and setters at the locations shown m the Plans. D. Furnish and install hardware and software for the supplied AMR system, along with startup, testing, and operator training. E. Modify water service lines at the locations shown on the Plans. F. Restore all surfaces disturbed by construction activities, including concrete curb, gutter, and sidewalk, and HMA pavement. G. Provide testing, commissioning, and training. H. Provide all associated work as shown in the Contract Documents, for a complete and workable system. The Work shall be substantially complete within 75 working days after the commencement date stated in the Notice to Proceed. All Bids must be accompanied by a certified check, money order, or bid bond payable to the City of Soap Lake and in an amount of not less than five percent (5%) of the total amount bid. All listed iron and steel products used in this project must be produced in the United States. The term 'iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The deminimis and minor components waiver apply to this contract. Financing for the Project has been provided by the United States Department of Agriculture Rural Development and the City of Soap Lake. The City of Soap Lake expressly reserves the right to reject any or all bids and to waive minor irregularities or informalities and to award the Work to the responsible Bidder submitting the lowest responsive Bid for whichever schedule as best services the interests of the Owner. Only one schedule will be awarded. The Owner will determine at the time of award which schedule will be awarded. $660,000 to $760,000

Final Planning

Municipal

$895,025.00

Public - City

Renovation

18

13

7

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
2
Bidding Soon
89
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2019

January 1, 2020

img_map_placeholder

To Be Determined, Soap Lake, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.