BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Pelion, South Carolina. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The project will generally consist on the reconstruction of the northern portion of the aircraft parking apron. The project will be bid with a base bid and an additive bid described as follows: Base Bid generally consists of the reconstruction of approximately 7,000 square yards of existing aircraft parking apron. The existing pavement, which is 2 asphalt over 6 of crushed aggregate base course, will be removed. Minor subgrade earthwork will be performed prior to installation of the new pavement section, which will be 4 of new bituminous surface course (placed in two equal lifts) over 6 of Macadam base course. The work will also include approximately 120 square yards of 6 thick concrete pavement, removal and replacement of aircraft tiedowns, pavement markings and erosion control. Additive Bid generally consists of the reconstruction of approximately 2,200 square yards of existing taxilane pavement. The existing pavement, which is 6 concrete, will be removed. Minor subgrade earthwork will be performed prior to installation of the new pavement section, which will be 4 of new bituminous surface course (placed in two equal lifts) over 6 of Macadam base course. The work will also include approximately 120 square yards of 6 thick concrete pavement, pavement markings and erosion control.

Post-Bid

Transportation Terminals

$500,000.00

Public - County

Paving, Site Work

17

19

8

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
46
Bidding Soon
618
All Active Projects
287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2019

July 22, 2019

img_map_placeholder

100 State Rd S-32-1583, Pelion, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.