BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2019 at 8:00 PM

Updated April 15, 2024

Renovation of an educational facility in Greensboro, North Carolina. Completed plans call for the renovation of a educational facility.

The project includes, but is not limited to, renovation of Room 137 and alteration to Conference Room 235, both spaces being in the Bryan Building. The work will require some reconfiguration of the existing mechanical, electrical, and plumbing systems. The work will be done in two phases: Phase 1 must be complete by July 31, 2019; Phase 2 shall commence upon completion of Phase 1 and shall be completed by November 22, 2019. Complete phasing information is available within the drawing package. There are four (4) Alternate Bids, each of which are outlined on sheet G000 of the bid drawings.

Post-Bid

Educational

$500,000.00

Public - State/Provincial

Renovation

30

3

12

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
180
Bidding Soon
2,231
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2019

July 18, 2019

Project location map

516 Stirling St, Greensboro, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.