Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 26, 2022 at 8:00 PM
Updated October 24, 2023
Site work for a bridge / tunnel in Easton, Washington. Completed plans call for site work for a bridge / tunnel.
Est. Value Notes: $1.0 to $1.2 Millon. The Work to be performed within 60 (sixty) working days from the date of Notice to Proceed consists of furnishing all materials, equipment, tools, labor, and other work or items incidental thereto for: This Contract provides for the replacement of an undersized culvert on Kachess Lake Road. The culvert will be replaced with a larger structure that meets current design standards and will reduce annual maintenance, better accommodate high flows, and improve fish habitat, all in accordance with the attached Contract Plans, Contract Provisions, and the Standard Specifications. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$1,038,915.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
