BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 3, 2021 at 8:00 PM

Updated April 26, 2025

Site work for a bridge / tunnel in Alexandria, Virginia. Completed plans call for site work for a bridge / tunnel.

Includes a 2 mi long, 12 ft diameter storage and conveyance tunnel; multiple deep shafts; two large, below-ground pumping stations; the significant expansion of the 0.5 mi long Hooffs Run Interceptor sewer; and two diversion facilities. The major elements of the project include tunneling, earthwork, concrete, trucking, miscellaneous metals, asphalt and concrete paving, striping, landscaping and wetland restoration, as well as numerous finish trades within the Tunnel Dewatering and Wet Weather Pumping Station.

Under Construction

Bridges / Tunnels

$300,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
466
Active Projects
165
Bidding Soon
2,992
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2020

June 1, 2021

Project location map

To Be Determined, Alexandria, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.