BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2019 at 8:00 PM

Updated October 3, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Cobden, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of 07/17/2019 Awarded with $246,593.60. Bridge Replacement Over J.d. 30 (No. 92188 Old) (Br. 64j60 New) With Approach Grading and Bituminous Surfacing on Sap 064-604-054 Located on Csah 4 Between Csah 13 and Csah 2. The County Board reserves the right to reject any or all bids or to waive defects. Bids must be accompanied by a corporate surety bond or a certified check made payable to the County Aud./Treas. for 5% of the amount of the proposal. Read Carefully the Wage Scales as They Affect This Project: Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581. Those which apply are set forth in the Proposal for this Project. MNDOT - Bridge Replacement

Award

Bridges / Tunnels

$246,594.00

Public - County

Demolition, New Construction, Paving, Site Work

23

1

2

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
75
Bidding Soon
945
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2019

July 22, 2019

Project location map

County Rd 4, Cobden, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.