Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Edmonds, Washington. Completed plans call for site work for a water / sewer project.
This Contract provides for the construction of the Dayton Street Stormwater Pump Station Project. The Work includes, but is not limited to: select demolition and removal; roadway rehabilitation of the roadway with crushed surfacing and hot mix asphalt; construction of cement concrete sidewalks, curbs, and gutters, a new 9.4 cubic foot per second (cfs) (4,233 gpm) duplex submersible stormwater pump station, approximately 200 feet of 18-inch diameter and force main, 25 feet of 24-inch-daimeter gravity storm drain, a backflow prevention device, stormwater systems, including manholes, catch basins, valves, and valve vault, and other electrical appurtenances including an electrical service cabinet, control panel, permanent standby emergency generator, transformer, electricallines, and junction boxes; joint utility trench including conduits and utility vaults, traffic control, property restoration, and miscellaneous work all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications. A certified check, cashier's check or bid bond in the amount equal to at least five percent of the total amount of bid, including sales tax if applicable, must accompany each bid as evidence of good faith and as a guarantee that, if awarded the contract, the bidder will execute the contract and give payment and performance bonds as required. The check will be given as a guarantee that the bidder shall execute the contract in conformity with the contract documents ifit is awarded to him and. shall, provide payment and performance bonds as specified therein within ten calendar days after notification of the award of contract to the bidder. The City of Edmonds reserves the right to reject a ny or all bids, and to waive irregularities or informalities in the bid or in the bidding. No bidder may withdraw his bid after the hour set for the opening thereof or before award of contract, unless said award is delayed for a period, exceeding sixty calendar days.
Post-Bid
Water / Sewer
$1,325,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2019
September 9, 2019
Dayton St, Edmonds, WA
Related To This Project
Edmonds, WA
Bid Date: Oct 08 2024
Edmonds, WA
Bid Date: Feb 24 2023
Edmonds, WA
--
Edmonds, WA
Bid Date: Jun 27 2023
Edmonds, WA
--
Edmonds, WA
Bid Date: Jul 24 2023
Edmonds, WA
Bid Date: Aug 03 2023
Edmonds, WA
Bid Date: Sep 06 2022
Edmonds, WA
--
Edmonds, WA
--
Edmonds, WA
Bid Date: Jul 14 2022
Edmonds, WA
Bid Date: Jun 17 2022
Edmonds, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.