BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Edmonds, Washington. Completed plans call for site work for a water / sewer project.

This Contract provides for the construction of the Dayton Street Stormwater Pump Station Project. The Work includes, but is not limited to: select demolition and removal; roadway rehabilitation of the roadway with crushed surfacing and hot mix asphalt; construction of cement concrete sidewalks, curbs, and gutters, a new 9.4 cubic foot per second (cfs) (4,233 gpm) duplex submersible stormwater pump station, approximately 200 feet of 18-inch diameter and force main, 25 feet of 24-inch-daimeter gravity storm drain, a backflow prevention device, stormwater systems, including manholes, catch basins, valves, and valve vault, and other electrical appurtenances including an electrical service cabinet, control panel, permanent standby emergency generator, transformer, electricallines, and junction boxes; joint utility trench including conduits and utility vaults, traffic control, property restoration, and miscellaneous work all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications. A certified check, cashier's check or bid bond in the amount equal to at least five percent of the total amount of bid, including sales tax if applicable, must accompany each bid as evidence of good faith and as a guarantee that, if awarded the contract, the bidder will execute the contract and give payment and performance bonds as required. The check will be given as a guarantee that the bidder shall execute the contract in conformity with the contract documents ifit is awarded to him and. shall, provide payment and performance bonds as specified therein within ten calendar days after notification of the award of contract to the bidder. The City of Edmonds reserves the right to reject a ny or all bids, and to waive irregularities or informalities in the bid or in the bidding. No bidder may withdraw his bid after the hour set for the opening thereof or before award of contract, unless said award is delayed for a period, exceeding sixty calendar days.

Post-Bid

Water / Sewer

$1,325,000.00

Public - City

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
35
Bidding Soon
933
All Active Projects
388
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.